How we deliver
Most capacity work on Indian Railways happens next to running lines. We plan earthwork, bridge and track activities around traffic and power blocks, protect the running line at every stage, and use mega blocks to make gauge-conversion sections fit for commissioning. Our own fleet and batching plants let us open several fronts at once and hold pace across long corridors.
What we do
- Earthwork in embankment and cutting, blanketing and formation
- Minor bridges, cast-in-situ and precast RCC boxes, retaining and toe walls, drains
- Level-crossing works, Road Under Bridge (RUB) and Limited Height Subway (LHS) extensions, side drains
- Complete EPC packages including design, buildings and track linking
- Mega-block works to commission gauge-conversion sections

Track record
- 4 crore cum of earthwork in five years
- 145 km of new track in 12 months, commended by CAO (Construction), South East Central Railway (SECR), 2024
Selected projects
- Khurda Road–Bolangir new line, km 194–237 (43 route km) — East Coast Railway
- Wadsa–Gadchiroli new line, Churmura–Gadchiroli (15.48 km) — SECR
- Anuppur–Katni 3rd line, several packages — SECR
- Pt. Deen Dayal Upadhyay–Prayagraj 3rd line, Chunar–Vindhyachal–Unchdih — North Central Railway
- Rajkot–Kanalus doubling, two mid-sections (84.6 km) — Western Railway
- Jhansi–Manikpur doubling, Mahoba–Kabrai (24 km) and Mahoba chord (JV) — North Central Railway
- Gwalior–Sheopurkalan gauge conversion, Birpur–Seroni Road (EPC) — North Central Railway
- Chunar–Chopan doubling, Chunar–Khairahi and Khairahi–Chopan — North Central Railway
- Mhow–Sanawad gauge conversion, Choral–Mukhtiyara Balwada ghat section — Western Railway
- Rowghat–Jagdalpur new line, Jagdalpur–Kurkanar — SECR
- Chhattisgarh East–West Rail Corridor, Gevra–Pendra Road hard-rock formation and major bridge; Phase II Urga–Dharamjaigarh (62 km) — IRCON International
- Shivpur–Kathautia new line, Simariya–Shivpur (Pkg IV-A) — IRCON
- Singhpur–Shahdol 4th line and Gurda–Robertson chord line (6.42 km) — SECR
- Pendra Road–Anuppur 3rd line (50.10 km) (completed) — RITES / SECR