SN |
Description of Work |
Agreement Signing
Authority |
1 |
Construction and Augmentation of Rail Infrastructure for Handling of Coal Rake
received in Box-N Wagons including associated electrical & S&T system for NTPC SIPAT
Wagon Tippler Dist. Bilaspur (C.G) |
ADDI GENERAL MANAGER
(CIVIL), FOR GENERAL
MANAGER
(PROJECT)/RITES LTD SIPAT |
2 |
Construction of Staff and Officer’s quarters, office buildings, Service buildings, Station
buildings, Passenger Platform, Goods Platform, Const of New FOBs, Extension of FOBs
Roads, Drains, boundary, wall along with allied miscellaneous works in Chandia -
Jhalwara section in connection with works of Anuppur-Katni 3rd Line Project in Bilaspur
division of SEC Railway. |
DY CHIEF
ENGINEER(CON)/CIC/BILAS
PUR
|
3 |
Construction of Staff and Officer’s quarters, Office buildings, Service buildings, Station
buildings, Passenger Platform, Goods Platform, Const of New FOBs, Extension of FOBs
Roads, Drains, boundary, wall along with allied miscellaneous works in Karkeli(IN)
–Chandia(Ex.) section in connection with works of Anuppur-Katni 3rd Line Project in
Bilaspur division of SEC Railway |
CHIEF
ENGINEER/CON/II/BILASPU
R
|
4 |
Construction of Staff and Officers quarters, Office
buildings, Service buildings, Station buildings, Passenger Platform, Goods Platform, Const of New FOBs, Extension of FOBs, OHE depot, tower wagon shed, Roads, Drains, boundary wall along with allied miscellaneous works in Singhpur (In)-Karkeli (Ex) section in connection with works of Anuppur-Katni 3rd Line Project in Bilaspur division of SEC Railway. |
CHIEF ENGINEER/CON/II/BILASPUR
|
5 |
Construction Two-Lane Road Over Bridge (ROB) in lieu of Level Crossing No.
61/C/E at IR Chainage 624/11-13 and in lieu of Level Crossing No. 62&63 at IR
Chainage 627/9-11 including Railway Spans, adjacent Viaduct Spans, both side
approaches and diversion of road from LC-63 to LC-62 complete in all respect
in between Bhabhua-Durgaoti stations of Mughalsarai division of East Central Railway.JHAJHARIA-GALVANO JV. JHAJHARIA NIRMAN LIMITED HAVING SHARE OF 80% |
DY. CHIEF, PROJECT
MANAGER/ENGG,
SWARNA COMPLEX, 2ND
FLOOR, SUSUWAHI,
VARANASI
|
6 |
Construction of Two-Lane Road Over Bridge (ROB) in lieu of 02 (two) level crossings
No. 42/C/T at IR Chainage 571/25-27 between Karwandia – Sasaram and No. 45/C/E at
IR Chainage 578/9-11 between Sasaram-Kumahu including Obligatory Spans, Viaduct
Spans, Approach roads etc. complete in all respect in Mughalsarai division of East
Central Railway.JHAJHARIA-GALVANO JV. JHAJHARIA NIRMAN LIMITED HAVING SHARE OF 80% |
DY. CHIEF, PROJECT
MANAGER/ENGG,
SWARNA COMPLEX, 2ND
FLOOR, SUSUWAHI,
VARANASI
|
7 |
Excavation of Work for Design of Bridges and Building Earthwork in Fromation,
Construction of major and minor bridge, service building, (S & T building, gate goomty,
end goomty, OHE Depot PSI depot etc) supply of machine crushed stone ballast,
transportation of railway materials, P.Way works general electrical works for building
& stations and other allied works between KALUMNA station to KANHAN station
(uncluding both yards) in connection with 3rd BG Railway line between Rajanandgaon -
kalumna stations of Nagpur Division of SEC Railway |
CHIEF ENGINEER (CON) SEC
RAILWAY NAGPUR |
8 |
Execution of earthwork in formation, construction of major and minor bridge, supply of
machine crushed stone ballast, transportation of P.way materials, ececution of P.way
work, welding and other allied miscllaneous work between badwapara to mudaria (Ex)
and Chandia -Lohra (Ex) in connection wirh construction of Anuppur-Katni 3rd line of
Bilaspur Division of South East Central Railway. |
CHIEF ENGINEER
(CON)/II/SEC. RAILWAY
BILASPUR
|
9 |
Supplying, Laying and Linking of P-Way Works including Earthwork in Formation,
Construction of ROR, Major Bridge, Minor Bridges and other Allied Works From Ch. -
0.926 km to +5.000 km & Ch. +14.000 Km to +15.063 km for Khurja STPP near Danwar
Railway station in Distt. Bulandshahar (U.P.)
|
GENERAL MANAGER
(CONTRACTS) GANGA
BHAWAN PRAGATIPURAM,
BYPASS ROAD, RISHIKESH
249201 |
10 |
Execution of earth work, supply of ballast, Transportation of materials, track linking,
insertion of Turnouts, construction of bridges, Drain, Boundary wall, service buildings,
Construction/Extension of Platform, Platform shelter, FOB, and other allied
miscellaneous works in connection with Bilaspur Yard remodelling work |
chief engineer(con)/II, Ofice
of the Chief Admin
Officer(con), SEC Railway,
Bilaspur. |
11 |
Earth work in embankment and cutting including blanketing construction of minor
Bridge, Retaining/Toe wall, RUB/LHS extension, side Drains and other allied works
betwwen Vindhyachal Including (Km 742.00)-Unchdih Excluding (Km 778.00) in C/W 3rd
line between Pt.Deen Dayal Upadhyay Jn.-Prayagraj of Prayagraj division. |
CE C West
DYCE-C-ALD-ENGINEERING
Old GM NCR Office,
Nawab Yusuf Road
Allahabad, 211001
Uttar Pradesh, India |
12 |
Earth work in embankment and cutting including blanketing construction of minor
Bridges, Retaining/Toe wall ,RUB/LHS extension ,Side Drains and other allied works
between Chunar Excluding (Km 706.00)- Vindhyachal Excluding (Km 742) in C/W 3rd
line between Pt. Deen Dayal Upadhyay Jn.- Prayagraj of Prayagraj division
|
CE C West
DYCE-C-ALD-ENGINEERING
Old GM NCR Office,
Nawab Yusuf Road
Allahabad, 211001
Uttar Pradesh, India |
13 |
Execution of track linking works, insertion & dismantling of Turnouts, Transportation of
materials, Level crossing works and other allied miscellaneous works for 4th Line
between Akaltara (Ex) - Champa (In) in connection with construction of JharsugudaBilaspur4th Line |
chief engineer(con)/I, Ofice
of the Chief Admin
Officer(con), SEC Railway,
Bilaspur |
14 |
Execution of track linking works, insertion & dismantling of Turnouts, Transportation of
materials, Level crossing works and other allied miscellaneous works for 4th Line
between Kharsia(Ex.)-Sargaon(In) in connection with construction of JharsugudaBilaspur 4th Line |
chief engineer(con)/I, Ofice
of the Chief Admin
Officer(con), SEC Railway,
Bilaspur. |
15 |
Execution of track linking works, insertion & dismantling of Turnouts, Transportation of
materials, Level crossing works and other allied miscellaneous works for 4th Line
between Bilaspur (In) - Akaltara (In) in connection with construction of JharsugudaBilaspur4th Line |
chief engineer(con)/I, Ofice
of the Chief Admin
Officer(con), SEC Railway,
Bilaspur |
16 |
for Execution of Roadbed (earthwork in Cutting & Banking), Major Bridges, Minor
Bridges, ROBs, RUBs/LHSs , Building works, Laying of Blanket, Supply of Ballast, P.way
Linking and other allied items including General Power supply works between km.194
to 237 (43 Route km) of Khurda Road-Bolangir new BG Rail Link project of
E.Co.Railway. |
CPM/I/BBS
ECOR-CONST-HQ-ENGG
2nd Floor, North Block,
Rail Sadan,, Samanta
Vihar, Chandrasekarpur
Bhubaneswar, 751017
Odisha, India |
17 |
Balance work of Construction of new Multistoried Green Building for CAO/Con's Office,
South East Central Railway at Bilaspur with electrification, other allied and
development works in connection with construction of Building(Phase II) (JHAJHARIAPOWERTEK JV having 80% share holding) |
CAO-C-HQ-ENGINEERING
Office of CAO/C, SECR,
Bilaspur, 495004
Chhattisgarh, India
|
18 |
Earthwork in Formation, Minor Bridge, P-way Linking including supply of Track Ballast,
PSC Sleeper, P-way Fittings, Point & Crossings, Drain, BLT, Wall, S&T Cabin Building,
OHE and Electrical work ETC. in Connection with Project Management Consultancy
work for the proposed Construction/ Modification of Yard Line Disposal of Dry Ash
through Railway Network under Dry Ash Silo (stage-I) of M/s NTPC at sipat - (PKG-II)
|
RITES LIMITED |
19 |
Execution of various Track renewal works like TBR, TSR(P) and other track work under
the jurisdiction of Assistant Divisional Engineer/Manendragarh. |
SEC RAILWAY, BILASPUR |
20 |
Supply, delivery and stacking of 1,25,000 Cum 50 mm guage machine crushed track
ballast as per Railway's specification at Nowrozabad Depot from outside Railway land
and loading into Railway wagons under the jurisdiction of ADEN/UMR of Bilaspur
Division |
BILASPUR DIVISIONENGINEERING Sr.DEN-Coord- BSPs office, Near Titli
Chowk Bilaspur
|
21 |
Supply, delivery and stacking of 3,50,000 Cum. 50mm guage machine crushed track
ballast as per Railway's specification at Pendra Depot from outside Railway land and
loading into Railway wagons and capacity enhancement of pendra depot as a mega
depot of Bilaspur Division. |
BILASPUR
DIVISIONENGINEERING
Sr.DEN-Co-ordBSPs office, Near
Titli Chowk
Bilaspur |
22 |
Execution of work for construction of Road Over Bridge alongwith allied miscellaneous
works, in lieu of Railway level crossing No. 491 at km 968/11-13 & crossing No. 492 at
km 970/17-19 between Salekasa - Amgaon stations, Railway level crossing No. 496 at
km 977/28-30 near amgaon station between salekasa and amgaon station, Railway
level crossing No. 500 at Km 983/26-28 between Amgaon and Gudma and Gondia
stations and Railway level crossing No. 508 at Km 1003/03-05 between Gondia and
Gangajhari station on Howrah - Mumbai main line in Nagpur Division of SEC Railway.
SPSCPL- JHAJHARIA (JV) JHAJHARIA NIRMAN LIMITED HAVING SHARE OF 49%
|
SEC RAILWAY, BILASPUR |
23 |
Construction of Viaduct, Earthwork in embankment, Blanketing, construction of Minor
Bridges, Retaining wall and balance/misc works in connection with ROR line from
Karnauti to Bakhtiyarpur Link
|
East Central Railway
Mahendrughat Patna Bihar |
24 |
Elimination of manned level crossing by construction of Limited height subway at LC
No. 485 at Km 959/19-21 between Darekasa-Salekasa (DKS-SKS) block section. (2)
Elimination of manned level crossing by construction of Road Under Bridge at LC No.
517 at Km 1022/1-3 between Gangajhari-Kachewani (GJ-KWN) BLCIK SECTION (3)
Elimination of manned level crossing by construction of Limited height subway at LC
No. 514 at Km 1015/31-33 between Gangajhari-Gangajhari-Kachewani (GJ-KWN) block
section under the jurisdiction of ADEN Gondia |
SOUTH EAST CERNTRAL
RAILWAY |
25 |
Yard modification work in six yards between Rajkot (excluding) to Jamwanthali
(including) involving Earthwork for track laying, bridge extension, FOBs, Platforms &
Station Building construction, Track work, Electric general, over head electric
works(OHE) and Signalling & telecommunication Outdoor work in connection with
Rajkot – Kanalus doubling work in Rajkot division. (JNL TECHNO, JSE JV) (JNL 60% share
holding) |
WESTERN RAILWAY |
26 |
Yard modification work in six yards between Jamwanthali (excluding) to Kanalus
(including) involving Earthwork for track laying, bridge extension, FOBs, Platforms &
Station Building construction, Track work, Electric general, over head electric
works(OHE) and Signalling & telecommunication Outdoor work in connection with
Rajkot - Kanalus doubling work in Rajkot division (WORK EXECUTED UNDER JOINT
VENTURE IN THE NAME OF JHAJHARIA- TECHNOMECH-GSE -TIRUPATI JV, WHERE JNL
SHARE IS 70%) |
WESTERN RAILWAY |
27 |
Construction of Earth work, Minor Bridges, RUB's, Level crossings Extensions, Track
Laying and miscellaneous Civil works in Mid-section from Rajkot -Jam Wanthali
excluding yards (approx. 41.92 km) in connection with doubling work of Rajkot-Kanalus
section under Rajkot Division of Western Railway |
WESTERN RAILWAY |
28 |
Construction of Earth work, Minor Bridges, RUB's, Level crossings Extensions, Track
Laying and miscellaneous Civil works in Mid-section from Jam Wanthali - Kanalus
excluding yards (approx. 42.70 km) in connection with doubling work of Rajkot-Kanalus
section under Rajkot Division of Western Railway. |
WESTERN RAILWAY |
29 |
Construction of Road (ROB) of span 64.09 M Bow string steel Girder with four nos,
Ramps and construction of one limited Height Subway (LHS) at LC no. 3 at shalimar
station & yard area including service road & drains in connection with shalimar station
development Project under south Eastern Railway. |
IRCON INTERNATIONAL
LTD |
30 |
Elimination of manned level crossing by construction of LROB at LC No.542 at Km
1073/21-23 between Bhandara - Khat block section. & (2) Elimination of manned level
crossing by construction of LROB at LC No.543 at Km 1076/13-15 between Bhandara -
Khat (BRD-KT) block section under the jurisdiction of Sr. DEN/CO/ Nagpur. |
NAGPUR SECR DIVISION
ENGINEERING Room No.
218, DRM office complex,
Nagpur Maharashtra |
31 |
Construction of Road Over Bridge (ROB) in connection with elimination of Level
Crossing No. AB-20 at Km.918/6-8 between Bijuri- Boridand section and Construction of
Light Road Over Bridge (LROB) in connection with elimination of Level Crossing No.AB69 at Km.1016/4-5 between Karonji- Bisrampur section, Level Crossing No.AB-71 at Km.
1023/4-5 between Boridand- Ambikapur section and Level Crossing No.BC-2 at
Km.933/20-21 including existing FOB at Manendragarh yard of Bilaspur Division. |
BILASPUR DIVISIONENGINEERING Sr. DEN-Coord-BSPs Office, Near Titli
Chowk Bilaspur (C.G.) |
32 |
Construction of Tower wagan shed, sub station with 132kv switching station (Type X)
Tss and ssp for power supply arrangement of Ahmednagar to Beed station in
connection with Ahmednagar-Beed-Parli Vaijnath BG Line Project |
Dy Chief Engineer Con.
Central Railway |
33 |
Construction of Electrified Double Line Track between Penukonda Junction (KM
136.694) to Dharmavaram (KM 176.600) including Telecommunication & Electrical
works |
SWR-CONST-HQ-ENGG
CHIEF ADMINISTRATIVE
OFFICER South Western
Railway |
34 |
Construction of Viaducts at Y-Junction and at Br No-11 For the Proposed Railway Siding
of M/s NLC India Ltd, taking off from IB railway station of Bilaspur Division, SEC Railway
to Talabira Mines at Jharsuguda District of Odisha State, Package- “A”. |
SWPROJECT Unit Head
RITES Ltd.
PU/Bhubanseswar. |
35 |
Execution of balance works of earth work in formation, construction of major and
minor bridges, ROB/RUB, supply of machine crushed stone ballast, transportation of
P.Way materials, execution of P.Way works, welding and other allied miscellaneous
works between Mudaria (In) - Karkeli (Ex) section in connection with construction of
Anuppur-Katni 3rd line of Bilaspur Division of South East Central Railway.
|
CAO-E-HQ-ENGINEERING
OFFICE OF
CAO/C,SECR,Bilaspur
495004
|
36 |
Supply and stacking of machine crushed Stone Ballast in Yards for the section between
Gevra (km 0) to Pendra road (135.3 Km) & Urga to Kusmunda (Km 11.516) in
connection with the construction of New BG Electrified Double Railway Line for
Chhattisgarh East West Rail Corridor in the state of Chhattisgarh over South East
Central Railway.
|
PROJECT DIRECTOR/CGRP
IRCON INTERNATIONAL
LIMITED CHHATTISGARH
RAIL PROJECT
|
37 |
Upgradation of station under ABSS by improving circulating area, road, COP, repairs to
existing building and extension/ raising and surfacing of platform at Belapur(BAP) &
Ahmednagar(ANG) Station
|
SOLAPUR DIVISION-ENGG
OFFICE OF DRM, Central
Railway, Solapur 413001
Maharashtra India
|
38 |
Construction of important bridges at Tons river Br. No-05, km. 792/10-12 in
connection with Pt. Deen Dayal Upadhyay-Prayagraj 3rd line
|
NORTH CENTRAL RLY
|
39 |
Construction of 12m wide FOB and civil engineering works for providing lifts and
escalators at Bangarapet, Kuppam, Malur, Krishnarajapuram, Whitefield, Kengeri,
Channapatna, Mandya, Ramanagaram, Dodaballapur, Hindupur, Malleswaram,
Tumkur, Hosur and Dharmapuri Railway Stations under Amrit Bharat Station Scheme
(Phase 1).
|
BANGALORE DIVISIONGATI SHAKTI
|
40 |
Elimination of level crossing No. BK-107 in Jhalwara yard by provision of Light ROB of
Bilaspur Division.
|
SOUTH EAST CERNTRAL
RAILWAY
|
41 |
Construction of 12 m wide FOB at 6 stations (Talegaon, Akurdi, Hadapsar, Satara, Sangli
and Kolhapur) in Pune division under ABSS
|
PUNE DIVISION-GATI
SHAKTI
|
42 |
Provision of 12 metre wide FOB works in connection with Amrita Bharat
station scheme at Rewari, Khairthal, Alwar, Rajgarh, Bandikui, Dausa, Asalpur Jobner,
Phulera, Naraina, Ringus, Nim ka thana, Sikar & Jhunjhunu Station.
|
JAIPUR DIVISION-GATI
SHAKTI / GSU-ENGG-JP2023-24-20 /
00828690088542
|
43 |
Construction of RCC Boundary Wall for raising of speed from 130 Kmph to 160 Kmph in
DDU-CNB section for balance length under Sr. Divl. Engineer-I & Sr. Divl. EngineerII/North Central Railway/Prayagraj
|
NORTH CENTRAL RLY
|
45 |
Construction of 29 Nos. Road Over Bridges (ROBs) in connection with new line between
Beed - Parli Section under Solapur Division in the Central Railway zone.
|
NORTH CENTRAL RLY
|
46 |
Provision of Foot Over Bridge 12/6 m wide with lifts at Balharshah (NSG-3),
Chandrapur (NSG-4), Betul (NSG-4), Sewagram (NSG-4), Godhani (NSG-6), Dhamangaon
(NSG-5), Ghoradongri (NSG-5) and 6m vide FOB at Pulgaon (NSG-5) (Total 8 stations)
under Amrit Bharat station scheme
|
CENTRAL RLY
|
47 |
Provision of Foot Over Bridge 12/6 m wide with lifts at Balharshah (NSG-3),
Chandrapur (NSG-4), Betul (NSG-4), Sewagram (NSG-4), Godhani (NSG-6), Dhamangaon
(NSG-5), Ghoradongri (NSG-5) and 6m vide FOB at Pulgaon (NSG-5) (Total 8 stations)
under Amrit Bharat station scheme
|
CENTRAL RLY
|
48 |
TSK Division- Provision of FOB 12.0 M wide at SLGR, NAM and NHK Station in
connection with Amrit Bharat Station Scheme
|
N F RAILWAY
|
49 |
Execution of balance works of earthwork in formation, construction of major and
minor bridges, ROB/RUB, supply of machine crushed stone ballast, transportation of
P.Way materials, execution of P.Way works, welding and other allied miscellaneous
works between Karkeli(In) to Lorha(In) and Chandia Road(In) to Rupaund(In) section in
connection with construction of Anuppur-Katni 3rd line of Bilaspur Division of South
East Central Railway.
|
SOUTH EAST CENTRAL RLY
|
50 |
Assembling, Laying and Linking of Railway Track for Main Lines & Loop Lines with
Contractor's own P-Way Materials (including supply of Ballast and Sleepers but
excluding supply of Rails) between Kathautia to Duari (Km -0.700 to Km 13.900)
including Kathautia, Sahpur & Duari Yard and Shivpur to Kharika (Km 44.2 to Km 47.2)
including Kharika Yard in connection with the construction of Shivpur-Kathautia New BG
Electrified Rail Line Project in the State of Jharkhand (PKG-VIIIA).
|
IRCON INTERNATIONAL
LTD
|
51 |
Improvement/Standardization of cess between Durg-Bhilai Nagar-Bhilai section & BhilaiSarona-Mandhar section under the jurisdiction of ADEN/I/Bhilai.
|
SOUTH EAST CENTRAL RLY
|
52 |
Provision of 12 m wide centralized FOB atKopargaon(KPG),
Ahmednagar(ANG),Pandharpur(PVR),Kalaburgi(KLBG), Wadi(WD),Daund(DD)
&Solapur(SUR).(Re-invitation)
|
CENTRAL RLY
|
53 |
Execution of work for design and drawing of bridges, buildings and protection work,
earthwork in formation, construction of major and minor bridges, service buildings,
supply of machine crushed stone ballast, transportation of railway materials, P.Way
linking works, Launching of Open Web Girders and other allied works between
Churmura PH (Excluding yard) Ch: 37.20 to Gadchiroli (including yard) Ch: 52.68 (15.48
KM) in connection with Wadsa - Gadchiroli BG New Railway line of Nagpur Division of
SEC Railway
|
SOUTH EAST CENTRAL RLY
|
54 |
Earth work in formation in fillings, cuttings including blanketing, drains, retaining walls,
construction of Minor Bridges with cast in situ and also with Pre-cast segmental RCC
boxes, construction of Major bridges, FOBs, Platforms, Station buildings, LC gate
buildings, circulating area, TRD buildings, S&T buildings, RUB extension by PSC-U-Girder
arrangements along with Piling works by hydraulic Rig machine, supply of ballast and
any other connected works etc., between Mahoba (including)-Kabrai (including) 24 Kms
and Mahoba chord line 4 Km in connection with Jhansi -Manikpur & Khairar - Bhimsen
doubling project. JV 51%
|
NORTH CENTRAL RLY
|
55 |
Supply and stacking of 60,000 cum Machine Crushed Track Ballast as per Railways
Specification at Jujomura Depot from outside Railway land/quarry and loading into
Railway's Wagons under the jurisdiction of ADEN/Sambalpur of Sambalpur Division
(Period of Completion: 18 months excluding Monsoon Period).
|
Sr. DEN/ Co-ord/SBP
SAMBALPUR DNGG
Office of the DRM
EAST COAST RAL,
Sambalpur, 768002
Odisha, India
|
56 |
Construction of Road Over Bridge (ROB) in connection with elimination of Level Crossing No. AB-20 at Km.918/6-8 between Bijuri- Boridand section and Construction of Light Road Over Bridge (LROB) in connection with elimination of Level Crossing No.AB-69 at Km.1016/4-5 between Karonji- Bisrampur section, Level Crossing No.AB-71 at Km. 1023/4-5 between Boridand- Ambikapur section and Level Crossing No.BC-2 at Km.933/20-21 including existing FOB at Manendragarh yard of Bilaspur Division.
|
BILASPUR DIVISION-ENGINEERING Sr. DEN-Co-ord-BSPs Office, Near Titli Chowk Bilaspur (C.G.)
|
57 |
Construction of Tower wagan shed, sub station with 132kv switching station (Type X) Tss and ssp for power supply arrangement of Ahmednagar to Beed station in connection with Ahmednagar-Beed-Parli Vaijnath BG Line Project
|
Dy Chief Engineer Con. Central Railway
|
58 |
Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including Telecommunication & Electrical works
|
SWR-CONST-HQ-ENGG CHIEF ADMINISTRATIVE OFFICER South Western Railway
|
59 |
Engineering Procurement and Construction (EPC) Agreement for - "All civil engineering works(Earthwork, Blanketing, Retaining Wall/Boundary Wall/Side Drain, Major Bridges, Minor
Bridges, RUBs, LCs, Station Buildings, Service buildings, Quarters, Other Buildings, Platforms etc. )and Supply of Machine Crushed Stone Ballast including track linking works, in between block section from Birpur (excluding) to Seroni Road (including) GC Project
excluding [Kuno Important Bridge and its approaches](including certain Pway works) & excluding [ROB 210 and TRD and S&T work] in connection with Gwalior - Sheopurkalan GC Project of North Central Railway
|
DYCE-C-GWL-ENGINEERING Office of the Dy. Chief Engieer Constn. Gwalior Platform no. 4 Railway station Gwalior Madhya Pradesh
|
60 |
Construction of Viaducts at Y-Junction and at Br No-11 For the
Proposed Railway Siding of M/s NLC India Ltd, taking off from IB
railway station of Bilaspur Division, SEC Railway to Talabira Mines
at Jharsuguda District of Odisha State, Package- “A”.
|
PROJECT Unit Head
RITES Ltd. PU/Bhubanseswar
|
61 |
Execution of balance works of earth work in formation, construction of major and minor bridges, ROB/RUB, supply of machine crushed stone ballast, transportation of P.Way materials, execution of P.Way works, welding and other allied miscellaneous works between Mudaria (In) - Karkeli (Ex) section in connection with construction of Anuppur-Katni 3rd line of Bilaspur Division of South East Central Railway.
|
CAO-E-HQ-ENGINEERING OFFICE OF CAO/C,SECR,Bilaspur 495004
|
62 |
Supply and stacking of machine crushed Stone Ballast in Yards for the section between Gevra (km 0) to Pendra road (135.3 Km) & Urga to Kusmunda (Km 11.516) in connection with the construction of New BG
Electrified Double Railway Line for Chhattisgarh East West Rail Corridor in the state of Chhattisgarh over South East Central Railway.
|
PROJECT DIRECTOR/CGRP
IRCON INTERNATIONAL LIMITED CHHATTISGARH RAIL PROJECT
|
63 |
Upgradation of station under ABSS by improving circulating area, road, COP, repairs to existing building and extension/ raising and surfacing of platform at Belapur(BAP) & Ahmednagar(ANG) Station.
|
SOLAPUR DIVISION-ENGG OFFICE OF DRM, Central Railway, Solapur 413001 Maharashtra India
|
64 |
Construction of important bridges at Tons river Br. No-05, km. 792/10-12 in connection with Pt. Deen Dayal Upadhyay-Prayagraj 3rd line
|
Dyce-C-ALD-ENGINEERING Old GM NCR Office, Nawab Yusuf Road Allahabad, 211001 Uttar Pradesh, India
|
65 |
BENGALURU DIVISION: Construction of 12m wide FOB and civil engineering works for
providing lifts and escalators at Bangarapet, Kuppam, Malur, Krishnarajapuram, Whitefield, Kengeri, Channapatna, Mandya, Ramanagaram, Dodaballapur, Hindupur, Malleswaram, Tumkur, Hosur and Dharmapuri Railway Stations under Amrit Bharat Station Scheme
(Phase 1).
|
CPM/Gati Shakti / SBC
South Western Railway
|
66 |
Elimination of level crossing No. BK-107 in Jhalwara yard by provision of Light ROB of Bilaspur Division.
|
Sr. Denco-ord
Near Titli Chock Bilaspur 495004
|
67 |
Construction of 12 m wide FOB at 6 stations (Talegaon, Akurdi, Hadapsar, Satara, Sangli and Kolhapur) in Pune division under ABSS
|
CPM/GSU/PA
PUNE DIVISION-GATI SHAKTI-DRM OFFICE BUILDING PUNE 411001
|
68 |
Dy. CE (GSU) JP Div.: Provision of 12 metre wide FOB works in connection with Amrita Bharat station scheme at Rewari, Khairthal, Alwar, Rajgarh, Bandikui, Dausa, Asalpur Jobner, Phulera, Naraina, Ringus, Nim ka thana, Sikar & Jhunjhunu Station.
|
CCPM/GSU/JP
JAYPUR DIVISION - GATI SHAKTI UNIT OLD NWR GM office Complex, Hasanpura Road Jaupur, 302006
|
69 |
Construction of RCC Boundary Wall for raising of speed from 130 Kmph to 160 Kmph in DDU-CNB section for balance length under Sr. Divl. Engineer-I & Sr. Divl. Engineer-II/North
Central Railway/Prayagraj.
|
PRAYAGRAJ DIVISION-ENGG
Divisional Railway Manager Office,
Nawab Yusuf Road Prayagraj, 211001
Uttar Pradesh, India
|
70 |
Construction of 29 Nos. Road Over Bridges (ROBs) in connection with new line between Beed - Parli Section under
Solapur Division in the Central Railway zone.
|
CR-CAO-C-HQENGG Office of CAO/C,
CSTM, 6th FLOOR, NEW ADMN.
BUILDING, D N ROAD, MUMBAI
CST, PIN 400001. Mumbai, 400001
Maharashtra, India
|
71 |
Provision of Foot Over Bridge 12/6 m wide with liftsat Balharshah (NSG-3), Chandrapur (NSG-4), Betul (NSG-4),Sewagram (NSG-4), Godhani (NSG-6), Dhamangaon (NSG-5),Ghoradongri (NSG-5) and 6m vide FOB at Pulgaon (NSG-5)(Total 8 stations) under Amrit Bharat station scheme.
|
CR-CAO-C-HQENGG Office of CAO/C,
CSTM, 6th FLOOR, NEW ADMN.
BUILDING, D N ROAD, MUMBAI
CST, PIN 400001. Mumbai, 400001
Maharashtra, India
|
72 |
At TSK Division- Provision of FOB 12.0 M wide at SLGR, NAM and NHK Station in connection with Amrit Bharat Station Scheme.
|
TINSUKIA DIVISIONENGINEERING
O/O DRM, works , Tinsukia, DRM Office building, N.F. Railway Tinsukia,
786125 Assam , India
|
73 |
Execution of balance works of earthwork in formation, construction of major and minor bridges, ROB/RUB, supply of machine crushed stone ballast, transportation of P.Way materials, execution of P.Way works, welding and other allied miscellaneous works between Karkeli(In) to Lorha(In) and Chandia Road(In) to Rupaund(In) section in connection with construction of Anuppur-Katni 3rd line of Bilaspur Division of South East Central Railway.
|
CAO-C-HQENGINEERING
Office of CAO/C, SECR,
Bilaspur, 495004
Chhattisgarh, India
|
74 |
Assembling, Laying and Linking of Railway Track for Main Lines & Loop Lines with Contractor's own P-Way Materials (including supply of Ballast and Sleepers
but excluding supply of Rails) between Kathautia to Duari (Km -0.700 to Km
13.900) including Kathautia, Sahpur & Duari Yard and Shivpur to Kharika (Km
44.2 to Km 47.2) including Kharika Yard in connection with the construction of
Shivpur-Kathautia New BG Electrified Rail Line Project in the State of Jharkhand
(PKG-VIIIA)
|
IRCON INTERNATIONAL LIMITED
121/C, Mandir Marg, Ashok Nagar, Ranchi *-834002 Jharkhand
|
75 |
for Improvement/Standardization of cess between Durg-Bhilai Nagar-Bhilai section & Bhilai-Sarona-Mandhar section under the jurisdiction of ADEN/I/Bhilai.
|
RAIPUR DIVISIONENGINEERING Engineering
Department, DRM Office Complex
Raipur, 492008 Chhattisgarh, India
|
76 |
Provision of 12 m wide centralized FOB at Kopargaon(KPG), Ahmednagar(ANG),Pandharpur(PVR), Kalaburgi(KLBG), Wadi(WD),Daund(DD) & Solapur(SUR).(Re-invitation)
|
CPM/GSU/SUR
SOLAPUR DIVISIONENGG
Office of DRM,
Central Railway,
Solapur
Solapur, 413001
Maharashtra, India
|
77 |
Construction/Extension/Modification of FOBs, Platform's and COP in connection with proposed 5th & 6th line in between Borivali-Virar Stations of Western Railway Under Mumbai Urban Transport Project (MUTP) - Phase -IIIA
|
Executive Director/Techinical
|
78 |
Execution of work for design and drawing of bridges, buildings and protection work, earthwork in formation, construction of major and minor bridges, service buildings, supply of machine crushed stone ballast, transportation of railway materials, P.Way linking works, Launching of Open Web Girders and other allied works between Churmura PH (Excluding yard) Ch: 37.20 to Gadchiroli (including yard) Ch: 52.68 (15.48 KM) in connection with Wadsa - Gadchiroli BG New Railway line of Nagpur Division of SEC Railway
|
CAO-C-HQ-ENGINEERING
Office of CAO/C, SECR,
Bilaspur, 495004
Chhattisgarh, India
|
79 |
Earth work in formation in fillings, cuttings including blanketing, drains, retaining walls, construction of Minor Bridges with cast in situ and also with Pre-cast segmental RCC boxes, construction of Major bridges, FOBs, Platforms, Station buildings, LC gate buildings, circulating area, TRD buildings, S&T buildings, RUB extension by PSC-U-Girder arrangements along with Piling works by hydraulic Rig machine, supply of ballast and any other connected works etc., between Mahoba (including)-Kabrai (including) 24 Kms and Mahoba chord line 4 Km in connection with Jhansi -Manikpur & Khairar - Bhimsen doubling project.
JNL-AKS JV. JHAJHARIA NIRMAN LIMITED HAVING SHARE OF 51%
|
CPM/C/JHS
office of Dy. Chief Engineer Construction-I Jhansi, 284001
Uttar Pradesh, India
|
80 |
Supply and stacking of 60,000 cum Machine Crushed Track Ballast as per Railways Specification at Jujomura Depot from outside Railway land/quarry and loading into Railway's Wagons under the jurisdiction of ADEN/Sambalpur of Sambalpur Division (Period of Completion: 18 months excluding Monsoon Period).
|
Sr. DEN/ Co-ord/SBP
SAMBALPUR DNGG
Office of the DRM
EAST COAST RAL,
Sambalpur, 768002
Odisha, India
|
81 |
Talabira II & III OCP- “Construction of temporary approach road for proposed submerged towers of 132 KV Budhipadar- Jorabaga DC line and its removal after completion of Diversion-cum-Heightening of 132 KV Budhipadar- Jorabaga DC line at Jharsuguda
|
Chief Gendral Manager/CGM/PH Talabira Project
|
82 |
Construction of RUBs in the section from Birpur to Sheopurkalan in connection with GWL SOE GC Project
|
CE/C/HQ
DYCE-C-GWLENGINEERING Office of the
Dy.Chief Engineer Constn. Gwalior,
Platform No.4 Railway station,Gwalior
Gwalior, 474002 Madhya Pradesh ,
India
|