Ongoing Projects

LANDMARK ONGOING PROJECTS

SN Description of Work Agreement Signing Authority
1 Construction and Augmentation of Rail Infrastructure for Handling of Coal Rake received in Box-N Wagons including associated electrical & S&T system for NTPC SIPAT Wagon Tippler Dist. Bilaspur (C.G) ADDI GENERAL MANAGER (CIVIL), FOR GENERAL MANAGER (PROJECT)/RITES LTD SIPAT
2 Construction of Staff and Officer’s quarters, office buildings, Service buildings, Station buildings, Passenger Platform, Goods Platform, Const of New FOBs, Extension of FOBs Roads, Drains, boundary, wall along with allied miscellaneous works in Chandia - Jhalwara section in connection with works of Anuppur-Katni 3rd Line Project in Bilaspur division of SEC Railway. DY CHIEF ENGINEER(CON)/CIC/BILAS PUR
3 Construction of Staff and Officer’s quarters, Office buildings, Service buildings, Station buildings, Passenger Platform, Goods Platform, Const of New FOBs, Extension of FOBs Roads, Drains, boundary, wall along with allied miscellaneous works in Karkeli(IN) –Chandia(Ex.) section in connection with works of Anuppur-Katni 3rd Line Project in Bilaspur division of SEC Railway CHIEF ENGINEER/CON/II/BILASPU R
4 Construction of Staff and Officers quarters, Office buildings, Service buildings, Station buildings, Passenger Platform, Goods Platform, Const of New FOBs, Extension of FOBs, OHE depot, tower wagon shed, Roads, Drains, boundary wall along with allied miscellaneous works in Singhpur (In)-Karkeli (Ex) section in connection with works of Anuppur-Katni 3rd Line Project in Bilaspur division of SEC Railway. CHIEF ENGINEER/CON/II/BILASPUR
5 Construction Two-Lane Road Over Bridge (ROB) in lieu of Level Crossing No. 61/C/E at IR Chainage 624/11-13 and in lieu of Level Crossing No. 62&63 at IR Chainage 627/9-11 including Railway Spans, adjacent Viaduct Spans, both side approaches and diversion of road from LC-63 to LC-62 complete in all respect in between Bhabhua-Durgaoti stations of Mughalsarai division of East Central Railway.JHAJHARIA-GALVANO JV. JHAJHARIA NIRMAN LIMITED HAVING SHARE OF 80% DY. CHIEF, PROJECT MANAGER/ENGG, SWARNA COMPLEX, 2ND FLOOR, SUSUWAHI, VARANASI
6 Construction of Two-Lane Road Over Bridge (ROB) in lieu of 02 (two) level crossings No. 42/C/T at IR Chainage 571/25-27 between Karwandia – Sasaram and No. 45/C/E at IR Chainage 578/9-11 between Sasaram-Kumahu including Obligatory Spans, Viaduct Spans, Approach roads etc. complete in all respect in Mughalsarai division of East Central Railway.JHAJHARIA-GALVANO JV. JHAJHARIA NIRMAN LIMITED HAVING SHARE OF 80% DY. CHIEF, PROJECT MANAGER/ENGG, SWARNA COMPLEX, 2ND FLOOR, SUSUWAHI, VARANASI
7 Excavation of Work for Design of Bridges and Building Earthwork in Fromation, Construction of major and minor bridge, service building, (S & T building, gate goomty, end goomty, OHE Depot PSI depot etc) supply of machine crushed stone ballast, transportation of railway materials, P.Way works general electrical works for building & stations and other allied works between KALUMNA station to KANHAN station (uncluding both yards) in connection with 3rd BG Railway line between Rajanandgaon - kalumna stations of Nagpur Division of SEC Railway CHIEF ENGINEER (CON) SEC RAILWAY NAGPUR
8 Execution of earthwork in formation, construction of major and minor bridge, supply of machine crushed stone ballast, transportation of P.way materials, ececution of P.way work, welding and other allied miscllaneous work between badwapara to mudaria (Ex) and Chandia -Lohra (Ex) in connection wirh construction of Anuppur-Katni 3rd line of Bilaspur Division of South East Central Railway. CHIEF ENGINEER (CON)/II/SEC. RAILWAY BILASPUR
9 Supplying, Laying and Linking of P-Way Works including Earthwork in Formation, Construction of ROR, Major Bridge, Minor Bridges and other Allied Works From Ch. - 0.926 km to +5.000 km & Ch. +14.000 Km to +15.063 km for Khurja STPP near Danwar Railway station in Distt. Bulandshahar (U.P.) GENERAL MANAGER (CONTRACTS) GANGA BHAWAN PRAGATIPURAM, BYPASS ROAD, RISHIKESH 249201
10 Execution of earth work, supply of ballast, Transportation of materials, track linking, insertion of Turnouts, construction of bridges, Drain, Boundary wall, service buildings, Construction/Extension of Platform, Platform shelter, FOB, and other allied miscellaneous works in connection with Bilaspur Yard remodelling work chief engineer(con)/II, Ofice of the Chief Admin Officer(con), SEC Railway, Bilaspur.
11 Earth work in embankment and cutting including blanketing construction of minor Bridge, Retaining/Toe wall, RUB/LHS extension, side Drains and other allied works betwwen Vindhyachal Including (Km 742.00)-Unchdih Excluding (Km 778.00) in C/W 3rd line between Pt.Deen Dayal Upadhyay Jn.-Prayagraj of Prayagraj division. CE C West DYCE-C-ALD-ENGINEERING Old GM NCR Office, Nawab Yusuf Road Allahabad, 211001 Uttar Pradesh, India
12 Earth work in embankment and cutting including blanketing construction of minor Bridges, Retaining/Toe wall ,RUB/LHS extension ,Side Drains and other allied works between Chunar Excluding (Km 706.00)- Vindhyachal Excluding (Km 742) in C/W 3rd line between Pt. Deen Dayal Upadhyay Jn.- Prayagraj of Prayagraj division CE C West DYCE-C-ALD-ENGINEERING Old GM NCR Office, Nawab Yusuf Road Allahabad, 211001 Uttar Pradesh, India
13 Execution of track linking works, insertion & dismantling of Turnouts, Transportation of materials, Level crossing works and other allied miscellaneous works for 4th Line between Akaltara (Ex) - Champa (In) in connection with construction of JharsugudaBilaspur4th Line chief engineer(con)/I, Ofice of the Chief Admin Officer(con), SEC Railway, Bilaspur
14 Execution of track linking works, insertion & dismantling of Turnouts, Transportation of materials, Level crossing works and other allied miscellaneous works for 4th Line between Kharsia(Ex.)-Sargaon(In) in connection with construction of JharsugudaBilaspur 4th Line chief engineer(con)/I, Ofice of the Chief Admin Officer(con), SEC Railway, Bilaspur.
15 Execution of track linking works, insertion & dismantling of Turnouts, Transportation of materials, Level crossing works and other allied miscellaneous works for 4th Line between Bilaspur (In) - Akaltara (In) in connection with construction of JharsugudaBilaspur4th Line chief engineer(con)/I, Ofice of the Chief Admin Officer(con), SEC Railway, Bilaspur
16 for Execution of Roadbed (earthwork in Cutting & Banking), Major Bridges, Minor Bridges, ROBs, RUBs/LHSs , Building works, Laying of Blanket, Supply of Ballast, P.way Linking and other allied items including General Power supply works between km.194 to 237 (43 Route km) of Khurda Road-Bolangir new BG Rail Link project of E.Co.Railway. CPM/I/BBS ECOR-CONST-HQ-ENGG 2nd Floor, North Block, Rail Sadan,, Samanta Vihar, Chandrasekarpur Bhubaneswar, 751017 Odisha, India
17 Balance work of Construction of new Multistoried Green Building for CAO/Con's Office, South East Central Railway at Bilaspur with electrification, other allied and development works in connection with construction of Building(Phase II) (JHAJHARIAPOWERTEK JV having 80% share holding) CAO-C-HQ-ENGINEERING Office of CAO/C, SECR, Bilaspur, 495004 Chhattisgarh, India
18 Earthwork in Formation, Minor Bridge, P-way Linking including supply of Track Ballast, PSC Sleeper, P-way Fittings, Point & Crossings, Drain, BLT, Wall, S&T Cabin Building, OHE and Electrical work ETC. in Connection with Project Management Consultancy work for the proposed Construction/ Modification of Yard Line Disposal of Dry Ash through Railway Network under Dry Ash Silo (stage-I) of M/s NTPC at sipat - (PKG-II) RITES LIMITED
19 Execution of various Track renewal works like TBR, TSR(P) and other track work under the jurisdiction of Assistant Divisional Engineer/Manendragarh. SEC RAILWAY, BILASPUR
20 Supply, delivery and stacking of 1,25,000 Cum 50 mm guage machine crushed track ballast as per Railway's specification at Nowrozabad Depot from outside Railway land and loading into Railway wagons under the jurisdiction of ADEN/UMR of Bilaspur Division BILASPUR DIVISIONENGINEERING Sr.DEN-Coord- BSPs office, Near Titli Chowk Bilaspur
21 Supply, delivery and stacking of 3,50,000 Cum. 50mm guage machine crushed track ballast as per Railway's specification at Pendra Depot from outside Railway land and loading into Railway wagons and capacity enhancement of pendra depot as a mega depot of Bilaspur Division. BILASPUR DIVISIONENGINEERING Sr.DEN-Co-ordBSPs office, Near Titli Chowk Bilaspur
22 Execution of work for construction of Road Over Bridge alongwith allied miscellaneous works, in lieu of Railway level crossing No. 491 at km 968/11-13 & crossing No. 492 at km 970/17-19 between Salekasa - Amgaon stations, Railway level crossing No. 496 at km 977/28-30 near amgaon station between salekasa and amgaon station, Railway level crossing No. 500 at Km 983/26-28 between Amgaon and Gudma and Gondia stations and Railway level crossing No. 508 at Km 1003/03-05 between Gondia and Gangajhari station on Howrah - Mumbai main line in Nagpur Division of SEC Railway. SPSCPL- JHAJHARIA (JV) JHAJHARIA NIRMAN LIMITED HAVING SHARE OF 49% SEC RAILWAY, BILASPUR
23 Construction of Viaduct, Earthwork in embankment, Blanketing, construction of Minor Bridges, Retaining wall and balance/misc works in connection with ROR line from Karnauti to Bakhtiyarpur Link East Central Railway Mahendrughat Patna Bihar
24 Elimination of manned level crossing by construction of Limited height subway at LC No. 485 at Km 959/19-21 between Darekasa-Salekasa (DKS-SKS) block section. (2) Elimination of manned level crossing by construction of Road Under Bridge at LC No. 517 at Km 1022/1-3 between Gangajhari-Kachewani (GJ-KWN) BLCIK SECTION (3) Elimination of manned level crossing by construction of Limited height subway at LC No. 514 at Km 1015/31-33 between Gangajhari-Gangajhari-Kachewani (GJ-KWN) block section under the jurisdiction of ADEN Gondia SOUTH EAST CERNTRAL RAILWAY
25 Yard modification work in six yards between Rajkot (excluding) to Jamwanthali (including) involving Earthwork for track laying, bridge extension, FOBs, Platforms & Station Building construction, Track work, Electric general, over head electric works(OHE) and Signalling & telecommunication Outdoor work in connection with Rajkot – Kanalus doubling work in Rajkot division. (JNL TECHNO, JSE JV) (JNL 60% share holding) WESTERN RAILWAY
26 Yard modification work in six yards between Jamwanthali (excluding) to Kanalus (including) involving Earthwork for track laying, bridge extension, FOBs, Platforms & Station Building construction, Track work, Electric general, over head electric works(OHE) and Signalling & telecommunication Outdoor work in connection with Rajkot - Kanalus doubling work in Rajkot division (WORK EXECUTED UNDER JOINT VENTURE IN THE NAME OF JHAJHARIA- TECHNOMECH-GSE -TIRUPATI JV, WHERE JNL SHARE IS 70%) WESTERN RAILWAY
27 Construction of Earth work, Minor Bridges, RUB's, Level crossings Extensions, Track Laying and miscellaneous Civil works in Mid-section from Rajkot -Jam Wanthali excluding yards (approx. 41.92 km) in connection with doubling work of Rajkot-Kanalus section under Rajkot Division of Western Railway WESTERN RAILWAY
28 Construction of Earth work, Minor Bridges, RUB's, Level crossings Extensions, Track Laying and miscellaneous Civil works in Mid-section from Jam Wanthali - Kanalus excluding yards (approx. 42.70 km) in connection with doubling work of Rajkot-Kanalus section under Rajkot Division of Western Railway. WESTERN RAILWAY
29 Construction of Road (ROB) of span 64.09 M Bow string steel Girder with four nos, Ramps and construction of one limited Height Subway (LHS) at LC no. 3 at shalimar station & yard area including service road & drains in connection with shalimar station development Project under south Eastern Railway. IRCON INTERNATIONAL LTD
30 Elimination of manned level crossing by construction of LROB at LC No.542 at Km 1073/21-23 between Bhandara - Khat block section. & (2) Elimination of manned level crossing by construction of LROB at LC No.543 at Km 1076/13-15 between Bhandara - Khat (BRD-KT) block section under the jurisdiction of Sr. DEN/CO/ Nagpur. NAGPUR SECR DIVISION ENGINEERING Room No. 218, DRM office complex, Nagpur Maharashtra
31 Construction of Road Over Bridge (ROB) in connection with elimination of Level Crossing No. AB-20 at Km.918/6-8 between Bijuri- Boridand section and Construction of Light Road Over Bridge (LROB) in connection with elimination of Level Crossing No.AB69 at Km.1016/4-5 between Karonji- Bisrampur section, Level Crossing No.AB-71 at Km. 1023/4-5 between Boridand- Ambikapur section and Level Crossing No.BC-2 at Km.933/20-21 including existing FOB at Manendragarh yard of Bilaspur Division. BILASPUR DIVISIONENGINEERING Sr. DEN-Coord-BSPs Office, Near Titli Chowk Bilaspur (C.G.)
32 Construction of Tower wagan shed, sub station with 132kv switching station (Type X) Tss and ssp for power supply arrangement of Ahmednagar to Beed station in connection with Ahmednagar-Beed-Parli Vaijnath BG Line Project Dy Chief Engineer Con. Central Railway
33 Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including Telecommunication & Electrical works SWR-CONST-HQ-ENGG CHIEF ADMINISTRATIVE OFFICER South Western Railway
34 Construction of Viaducts at Y-Junction and at Br No-11 For the Proposed Railway Siding of M/s NLC India Ltd, taking off from IB railway station of Bilaspur Division, SEC Railway to Talabira Mines at Jharsuguda District of Odisha State, Package- “A”. SWPROJECT Unit Head RITES Ltd. PU/Bhubanseswar.
35 Execution of balance works of earth work in formation, construction of major and minor bridges, ROB/RUB, supply of machine crushed stone ballast, transportation of P.Way materials, execution of P.Way works, welding and other allied miscellaneous works between Mudaria (In) - Karkeli (Ex) section in connection with construction of Anuppur-Katni 3rd line of Bilaspur Division of South East Central Railway. CAO-E-HQ-ENGINEERING OFFICE OF CAO/C,SECR,Bilaspur 495004
36 Supply and stacking of machine crushed Stone Ballast in Yards for the section between Gevra (km 0) to Pendra road (135.3 Km) & Urga to Kusmunda (Km 11.516) in connection with the construction of New BG Electrified Double Railway Line for Chhattisgarh East West Rail Corridor in the state of Chhattisgarh over South East Central Railway. PROJECT DIRECTOR/CGRP IRCON INTERNATIONAL LIMITED CHHATTISGARH RAIL PROJECT
37 Upgradation of station under ABSS by improving circulating area, road, COP, repairs to existing building and extension/ raising and surfacing of platform at Belapur(BAP) & Ahmednagar(ANG) Station SOLAPUR DIVISION-ENGG OFFICE OF DRM, Central Railway, Solapur 413001 Maharashtra India
38 Construction of important bridges at Tons river Br. No-05, km. 792/10-12 in connection with Pt. Deen Dayal Upadhyay-Prayagraj 3rd line NORTH CENTRAL RLY
39 Construction of 12m wide FOB and civil engineering works for providing lifts and escalators at Bangarapet, Kuppam, Malur, Krishnarajapuram, Whitefield, Kengeri, Channapatna, Mandya, Ramanagaram, Dodaballapur, Hindupur, Malleswaram, Tumkur, Hosur and Dharmapuri Railway Stations under Amrit Bharat Station Scheme (Phase 1). BANGALORE DIVISIONGATI SHAKTI
40 Elimination of level crossing No. BK-107 in Jhalwara yard by provision of Light ROB of Bilaspur Division. SOUTH EAST CERNTRAL RAILWAY
41 Construction of 12 m wide FOB at 6 stations (Talegaon, Akurdi, Hadapsar, Satara, Sangli and Kolhapur) in Pune division under ABSS PUNE DIVISION-GATI SHAKTI
42 Provision of 12 metre wide FOB works in connection with Amrita Bharat station scheme at Rewari, Khairthal, Alwar, Rajgarh, Bandikui, Dausa, Asalpur Jobner, Phulera, Naraina, Ringus, Nim ka thana, Sikar & Jhunjhunu Station. JAIPUR DIVISION-GATI SHAKTI / GSU-ENGG-JP2023-24-20 / 00828690088542
43 Construction of RCC Boundary Wall for raising of speed from 130 Kmph to 160 Kmph in DDU-CNB section for balance length under Sr. Divl. Engineer-I & Sr. Divl. EngineerII/North Central Railway/Prayagraj NORTH CENTRAL RLY
45 Construction of 29 Nos. Road Over Bridges (ROBs) in connection with new line between Beed - Parli Section under Solapur Division in the Central Railway zone. NORTH CENTRAL RLY
46 Provision of Foot Over Bridge 12/6 m wide with lifts at Balharshah (NSG-3), Chandrapur (NSG-4), Betul (NSG-4), Sewagram (NSG-4), Godhani (NSG-6), Dhamangaon (NSG-5), Ghoradongri (NSG-5) and 6m vide FOB at Pulgaon (NSG-5) (Total 8 stations) under Amrit Bharat station scheme CENTRAL RLY
47 Provision of Foot Over Bridge 12/6 m wide with lifts at Balharshah (NSG-3), Chandrapur (NSG-4), Betul (NSG-4), Sewagram (NSG-4), Godhani (NSG-6), Dhamangaon (NSG-5), Ghoradongri (NSG-5) and 6m vide FOB at Pulgaon (NSG-5) (Total 8 stations) under Amrit Bharat station scheme CENTRAL RLY
48 TSK Division- Provision of FOB 12.0 M wide at SLGR, NAM and NHK Station in connection with Amrit Bharat Station Scheme N F RAILWAY
49 Execution of balance works of earthwork in formation, construction of major and minor bridges, ROB/RUB, supply of machine crushed stone ballast, transportation of P.Way materials, execution of P.Way works, welding and other allied miscellaneous works between Karkeli(In) to Lorha(In) and Chandia Road(In) to Rupaund(In) section in connection with construction of Anuppur-Katni 3rd line of Bilaspur Division of South East Central Railway. SOUTH EAST CENTRAL RLY
50 Assembling, Laying and Linking of Railway Track for Main Lines & Loop Lines with Contractor's own P-Way Materials (including supply of Ballast and Sleepers but excluding supply of Rails) between Kathautia to Duari (Km -0.700 to Km 13.900) including Kathautia, Sahpur & Duari Yard and Shivpur to Kharika (Km 44.2 to Km 47.2) including Kharika Yard in connection with the construction of Shivpur-Kathautia New BG Electrified Rail Line Project in the State of Jharkhand (PKG-VIIIA). IRCON INTERNATIONAL LTD
51 Improvement/Standardization of cess between Durg-Bhilai Nagar-Bhilai section & BhilaiSarona-Mandhar section under the jurisdiction of ADEN/I/Bhilai. SOUTH EAST CENTRAL RLY
52 Provision of 12 m wide centralized FOB atKopargaon(KPG), Ahmednagar(ANG),Pandharpur(PVR),Kalaburgi(KLBG), Wadi(WD),Daund(DD) &Solapur(SUR).(Re-invitation) CENTRAL RLY
53 Execution of work for design and drawing of bridges, buildings and protection work, earthwork in formation, construction of major and minor bridges, service buildings, supply of machine crushed stone ballast, transportation of railway materials, P.Way linking works, Launching of Open Web Girders and other allied works between Churmura PH (Excluding yard) Ch: 37.20 to Gadchiroli (including yard) Ch: 52.68 (15.48 KM) in connection with Wadsa - Gadchiroli BG New Railway line of Nagpur Division of SEC Railway SOUTH EAST CENTRAL RLY
54 Earth work in formation in fillings, cuttings including blanketing, drains, retaining walls, construction of Minor Bridges with cast in situ and also with Pre-cast segmental RCC boxes, construction of Major bridges, FOBs, Platforms, Station buildings, LC gate buildings, circulating area, TRD buildings, S&T buildings, RUB extension by PSC-U-Girder arrangements along with Piling works by hydraulic Rig machine, supply of ballast and any other connected works etc., between Mahoba (including)-Kabrai (including) 24 Kms and Mahoba chord line 4 Km in connection with Jhansi -Manikpur & Khairar - Bhimsen doubling project. JV 51% NORTH CENTRAL RLY
55 Supply and stacking of 60,000 cum Machine Crushed Track Ballast as per Railways Specification at Jujomura Depot from outside Railway land/quarry and loading into Railway's Wagons under the jurisdiction of ADEN/Sambalpur of Sambalpur Division (Period of Completion: 18 months excluding Monsoon Period). Sr. DEN/ Co-ord/SBP SAMBALPUR DNGG Office of the DRM EAST COAST RAL, Sambalpur, 768002 Odisha, India
56 Construction of Road Over Bridge (ROB) in connection with elimination of Level Crossing No. AB-20 at Km.918/6-8 between Bijuri- Boridand section and Construction of Light Road Over Bridge (LROB) in connection with elimination of Level Crossing No.AB-69 at Km.1016/4-5 between Karonji- Bisrampur section, Level Crossing No.AB-71 at Km. 1023/4-5 between Boridand- Ambikapur section and Level Crossing No.BC-2 at Km.933/20-21 including existing FOB at Manendragarh yard of Bilaspur Division. BILASPUR DIVISION-ENGINEERING Sr. DEN-Co-ord-BSPs Office, Near Titli Chowk Bilaspur (C.G.)
57 Construction of Tower wagan shed, sub station with 132kv switching station (Type X) Tss and ssp for power supply arrangement of Ahmednagar to Beed station in connection with Ahmednagar-Beed-Parli Vaijnath BG Line Project Dy Chief Engineer Con. Central Railway
58 Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including Telecommunication & Electrical works SWR-CONST-HQ-ENGG CHIEF ADMINISTRATIVE OFFICER South Western Railway
59 Engineering Procurement and Construction (EPC) Agreement for - "All civil engineering works(Earthwork, Blanketing, Retaining Wall/Boundary Wall/Side Drain, Major Bridges, Minor Bridges, RUBs, LCs, Station Buildings, Service buildings, Quarters, Other Buildings, Platforms etc. )and Supply of Machine Crushed Stone Ballast including track linking works, in between block section from Birpur (excluding) to Seroni Road (including) GC Project excluding [Kuno Important Bridge and its approaches](including certain Pway works) & excluding [ROB 210 and TRD and S&T work] in connection with Gwalior - Sheopurkalan GC Project of North Central Railway DYCE-C-GWL-ENGINEERING Office of the Dy. Chief Engieer Constn. Gwalior Platform no. 4 Railway station Gwalior Madhya Pradesh
60 Construction of Viaducts at Y-Junction and at Br No-11 For the Proposed Railway Siding of M/s NLC India Ltd, taking off from IB railway station of Bilaspur Division, SEC Railway to Talabira Mines at Jharsuguda District of Odisha State, Package- “A”. PROJECT Unit Head RITES Ltd. PU/Bhubanseswar
61 Execution of balance works of earth work in formation, construction of major and minor bridges, ROB/RUB, supply of machine crushed stone ballast, transportation of P.Way materials, execution of P.Way works, welding and other allied miscellaneous works between Mudaria (In) - Karkeli (Ex) section in connection with construction of Anuppur-Katni 3rd line of Bilaspur Division of South East Central Railway. CAO-E-HQ-ENGINEERING OFFICE OF CAO/C,SECR,Bilaspur 495004
62 Supply and stacking of machine crushed Stone Ballast in Yards for the section between Gevra (km 0) to Pendra road (135.3 Km) & Urga to Kusmunda (Km 11.516) in connection with the construction of New BG Electrified Double Railway Line for Chhattisgarh East West Rail Corridor in the state of Chhattisgarh over South East Central Railway. PROJECT DIRECTOR/CGRP IRCON INTERNATIONAL LIMITED CHHATTISGARH RAIL PROJECT
63 Upgradation of station under ABSS by improving circulating area, road, COP, repairs to existing building and extension/ raising and surfacing of platform at Belapur(BAP) & Ahmednagar(ANG) Station. SOLAPUR DIVISION-ENGG OFFICE OF DRM, Central Railway, Solapur 413001 Maharashtra India
64 Construction of important bridges at Tons river Br. No-05, km. 792/10-12 in connection with Pt. Deen Dayal Upadhyay-Prayagraj 3rd line Dyce-C-ALD-ENGINEERING Old GM NCR Office, Nawab Yusuf Road Allahabad, 211001 Uttar Pradesh, India
65 BENGALURU DIVISION: Construction of 12m wide FOB and civil engineering works for providing lifts and escalators at Bangarapet, Kuppam, Malur, Krishnarajapuram, Whitefield, Kengeri, Channapatna, Mandya, Ramanagaram, Dodaballapur, Hindupur, Malleswaram, Tumkur, Hosur and Dharmapuri Railway Stations under Amrit Bharat Station Scheme (Phase 1). CPM/Gati Shakti / SBC South Western Railway
66 Elimination of level crossing No. BK-107 in Jhalwara yard by provision of Light ROB of Bilaspur Division. Sr. Denco-ord Near Titli Chock Bilaspur 495004
67 Construction of 12 m wide FOB at 6 stations (Talegaon, Akurdi, Hadapsar, Satara, Sangli and Kolhapur) in Pune division under ABSS CPM/GSU/PA PUNE DIVISION-GATI SHAKTI-DRM OFFICE BUILDING PUNE 411001
68 Dy. CE (GSU) JP Div.: Provision of 12 metre wide FOB works in connection with Amrita Bharat station scheme at Rewari, Khairthal, Alwar, Rajgarh, Bandikui, Dausa, Asalpur Jobner, Phulera, Naraina, Ringus, Nim ka thana, Sikar & Jhunjhunu Station. CCPM/GSU/JP JAYPUR DIVISION - GATI SHAKTI UNIT OLD NWR GM office Complex, Hasanpura Road Jaupur, 302006
69 Construction of RCC Boundary Wall for raising of speed from 130 Kmph to 160 Kmph in DDU-CNB section for balance length under Sr. Divl. Engineer-I & Sr. Divl. Engineer-II/North Central Railway/Prayagraj. PRAYAGRAJ DIVISION-ENGG Divisional Railway Manager Office, Nawab Yusuf Road Prayagraj, 211001 Uttar Pradesh, India
70 Construction of 29 Nos. Road Over Bridges (ROBs) in connection with new line between Beed - Parli Section under Solapur Division in the Central Railway zone. CR-CAO-C-HQENGG Office of CAO/C, CSTM, 6th FLOOR, NEW ADMN. BUILDING, D N ROAD, MUMBAI CST, PIN 400001. Mumbai, 400001 Maharashtra, India
71 Provision of Foot Over Bridge 12/6 m wide with liftsat Balharshah (NSG-3), Chandrapur (NSG-4), Betul (NSG-4),Sewagram (NSG-4), Godhani (NSG-6), Dhamangaon (NSG-5),Ghoradongri (NSG-5) and 6m vide FOB at Pulgaon (NSG-5)(Total 8 stations) under Amrit Bharat station scheme. CR-CAO-C-HQENGG Office of CAO/C, CSTM, 6th FLOOR, NEW ADMN. BUILDING, D N ROAD, MUMBAI CST, PIN 400001. Mumbai, 400001 Maharashtra, India
72 At TSK Division- Provision of FOB 12.0 M wide at SLGR, NAM and NHK Station in connection with Amrit Bharat Station Scheme. TINSUKIA DIVISIONENGINEERING O/O DRM, works , Tinsukia, DRM Office building, N.F. Railway Tinsukia, 786125 Assam , India
73 Execution of balance works of earthwork in formation, construction of major and minor bridges, ROB/RUB, supply of machine crushed stone ballast, transportation of P.Way materials, execution of P.Way works, welding and other allied miscellaneous works between Karkeli(In) to Lorha(In) and Chandia Road(In) to Rupaund(In) section in connection with construction of Anuppur-Katni 3rd line of Bilaspur Division of South East Central Railway. CAO-C-HQENGINEERING Office of CAO/C, SECR, Bilaspur, 495004 Chhattisgarh, India
74 Assembling, Laying and Linking of Railway Track for Main Lines & Loop Lines with Contractor's own P-Way Materials (including supply of Ballast and Sleepers but excluding supply of Rails) between Kathautia to Duari (Km -0.700 to Km 13.900) including Kathautia, Sahpur & Duari Yard and Shivpur to Kharika (Km 44.2 to Km 47.2) including Kharika Yard in connection with the construction of Shivpur-Kathautia New BG Electrified Rail Line Project in the State of Jharkhand (PKG-VIIIA) IRCON INTERNATIONAL LIMITED 121/C, Mandir Marg, Ashok Nagar, Ranchi *-834002 Jharkhand
75 for Improvement/Standardization of cess between Durg-Bhilai Nagar-Bhilai section & Bhilai-Sarona-Mandhar section under the jurisdiction of ADEN/I/Bhilai. RAIPUR DIVISIONENGINEERING Engineering Department, DRM Office Complex Raipur, 492008 Chhattisgarh, India
76 Provision of 12 m wide centralized FOB at Kopargaon(KPG), Ahmednagar(ANG),Pandharpur(PVR), Kalaburgi(KLBG), Wadi(WD),Daund(DD) & Solapur(SUR).(Re-invitation) CPM/GSU/SUR SOLAPUR DIVISIONENGG Office of DRM, Central Railway, Solapur Solapur, 413001 Maharashtra, India
77 Construction/Extension/Modification of FOBs, Platform's and COP in connection with proposed 5th & 6th line in between Borivali-Virar Stations of Western Railway Under Mumbai Urban Transport Project (MUTP) - Phase -IIIA Executive Director/Techinical
78 Execution of work for design and drawing of bridges, buildings and protection work, earthwork in formation, construction of major and minor bridges, service buildings, supply of machine crushed stone ballast, transportation of railway materials, P.Way linking works, Launching of Open Web Girders and other allied works between Churmura PH (Excluding yard) Ch: 37.20 to Gadchiroli (including yard) Ch: 52.68 (15.48 KM) in connection with Wadsa - Gadchiroli BG New Railway line of Nagpur Division of SEC Railway CAO-C-HQ-ENGINEERING Office of CAO/C, SECR, Bilaspur, 495004 Chhattisgarh, India
79 Earth work in formation in fillings, cuttings including blanketing, drains, retaining walls, construction of Minor Bridges with cast in situ and also with Pre-cast segmental RCC boxes, construction of Major bridges, FOBs, Platforms, Station buildings, LC gate buildings, circulating area, TRD buildings, S&T buildings, RUB extension by PSC-U-Girder arrangements along with Piling works by hydraulic Rig machine, supply of ballast and any other connected works etc., between Mahoba (including)-Kabrai (including) 24 Kms and Mahoba chord line 4 Km in connection with Jhansi -Manikpur & Khairar - Bhimsen doubling project. JNL-AKS JV. JHAJHARIA NIRMAN LIMITED HAVING SHARE OF 51% CPM/C/JHS office of Dy. Chief Engineer Construction-I Jhansi, 284001 Uttar Pradesh, India
80 Supply and stacking of 60,000 cum Machine Crushed Track Ballast as per Railways Specification at Jujomura Depot from outside Railway land/quarry and loading into Railway's Wagons under the jurisdiction of ADEN/Sambalpur of Sambalpur Division (Period of Completion: 18 months excluding Monsoon Period). Sr. DEN/ Co-ord/SBP SAMBALPUR DNGG Office of the DRM EAST COAST RAL, Sambalpur, 768002 Odisha, India
81 Talabira II & III OCP- “Construction of temporary approach road for proposed submerged towers of 132 KV Budhipadar- Jorabaga DC line and its removal after completion of Diversion-cum-Heightening of 132 KV Budhipadar- Jorabaga DC line at Jharsuguda Chief Gendral Manager/CGM/PH Talabira Project
82 Construction of RUBs in the section from Birpur to Sheopurkalan in connection with GWL SOE GC Project CE/C/HQ DYCE-C-GWLENGINEERING Office of the Dy.Chief Engineer Constn. Gwalior, Platform No.4 Railway station,Gwalior Gwalior, 474002 Madhya Pradesh , India