SN |
Agmt No. |
Description of Work |
Contract Awarding Authority |
1 |
BRC/EN/TENDER-ROB/LC-142, 153 & 163/218/VOL III |
Construction of 2-Lane Road Over Bridge including approaches in lieu of existing Level Crossing Nos. II 142 At Rly Km-255/27-29 (DFCC Ch- 4/118.408) between Sachin and Bhestan stations of Western Railway, III 153 At Rly km 281/28-30 (DFCC Ch: 32413.160) between Sayan and Kudsad stations of Western Railway, III 163 At Rly km 301/30-32 (DFCC Ch: 52553.872) between Kosamba and Hathuran stations of Western Railway. |
CHIEF GENERAL MANAGER, DFCCIL, 4TH FLOOR, BLOCK A, NARMADA NAHER, BHAVAN, SARDAR SAROVER, NARMADA NIGAM LTD, CHHANI JAKHAT NAKA, VADODARA |
2 |
368/APR-SNGH/3RD LINE APR-KTE/CEC/SECR/18 |
Execution of earth work in formation, construction of major and minor bridges, supply of machine crushed stone ballast, transportation of P.Way materials, execution of P.Way works, welding and other allied miscellaneous works between Anuppur to Singpur (Ex) in connection with construction of Anuppur-Katni 3rd line of Bilaspur Division of South East Central Railway. |
DY. CHIF ENGINEER / CON-I SECR SHADOL MP |
3 |
RITES/RPO-N/BSP/AP-PR/PACKAGE-1/TS/2016 |
Construction of Earth work in formation, Bridges & Structures, P-way, shifting/provision of Electric/S&T utilities and other allied works for Third Line from Pendra Road to Anuppur section(50.10Km) of Bilaspur Division of South East Central Railway. |
GM/RPO/NORTH, ROC-1, GURGAON RITES LIMITED |
4 |
332/TROKOKA/3RDLINE/17-18/JNL DTD.
01.03.2018. |
Execution of work for design of bridges and buildings, earthwork in formation, construction of major and minor bridges, service buildings, (S&T Building, gate
goomty, end goomty, OHE Depot, PSI depot, etc), Supply of machine crushed stone ballast, transportation of railway materials, P.Way works general electrical
works for buildings & stations and other allied works between KOKA station (Including yard) to TIRODA station (Including yard) in connection with 3rd BG Railway line between Rajanandgaon - Kalumna stations of Nagpur Division of SEC Railway. |
CHIEF ENGINEER (CON)
SEC RAILWAY NAGPUR |
5 |
331/KOKA-RRL/3RDLINE/17-18/JNL DTD. 28.02.2018. |
Execution of work for design of bridges and buildings, earthwork in formation, constructrion of major and minor bridges,service buildings, (S&T Building, gate goomty, end goomty, OHE Depot, PSI depot, etc), Supply of machine crushed stone ballast, transportation of railway materials, P.Way works general electrical works for buildings & stations and other allied works between Revral station (including yard) to Koka station (Excluding yard) |
CHIEF ENGINEER (CON) SEC RAILWAY NAGPUR |
6 |
MGS/EN/10/2018-19/LC/52-II & 55/Bihar/274. |
Construction of Two-Lane Road Over Bridge (ROB) in lieu of 02 (two) level crossings No. 52-II at IR Chainage 600/5-7 between Kudra-Pusauli and No. 55 at IR Chainage 605/25-27 between Kudra-Pusauli including Obligatory Spans, Viaduct Spans, approaches roads, etc. complete in all respect in Mughalsarai division of East Central Railway. |
DY. CHIEF, PROJECT MANAGER/ENGG, SWARNA COMPLEX, 2ND FLOOR, SUSUWAHI, VARANASI |
7 |
MGS/EN/18/2018-19/LC-52-54-57/Bihar/282. |
Construction of Two-Lane Road Over Bridge (ROB) in lieu of 03 (three) level crossings No. 52/C/E at IR Chainage 594/17-19 Between Shivsagr - Khurmabad, No. 54/C/E at IR chainage 603/17-19 between Kudra -Pusauli and No. 57/C/E at IR chainage 612/25-27 between Pisauli - Mithani including Obligatory Span, Composite Grider Span,Viaduct Spans, Approach Roads and Service Roads etc. complete in all respect in Mughalsarai division of East Central Railway. |
DY. CHIEF, PROJECT MANAGER/ENGG, SWARNA COMPLEX, 2ND FLOOR, SUSUWAHI, VARANASI |
8 |
MGS/EN/16/2018-19/LC-35-37-48/Bihar/280. |
Construction of Two-Lane Road Over Bridge (ROB) in lieu of 03 (three) level crossings No. 35/C/E at IR Chainage 556/25-27 between Dehri-on-Sone-Pahleza, No. 37/C/E at IR Chainage 562/11-13 between Pahleza- Karwandia and No. 48/C/T at IR Chainage 585/1-3 between Kumhau -Shivsagar including Obligatory Span, Composite Grider Span, Viaduct Spans, Approach Roads and Service Roads etc. Complete in all respect in Mughalsarai division of East Central Railway. |
Dy. CPM/ Engg- II
DFCCIL/DDU |
9 |
MGS/EN/09/2018-19/LC/41-46-49-50/Bihar/273 Dtd. 29.09.2018 |
Construction of Approch Portion (except Railway Portion obligatory spans) of Two -Lane Road Over Bridge (ROB) at 04 (four) level crossing No. 41/C/E at IR Chainage 569/19-17 between Karwandia-Sasaram, No. 46/C/T IR Chainage 581/1-3Kumhau-Shivsagar, No. 49C/T IR Chainage 586/21-23 Shivsagar-Khurmabad and No. 50C/E IR Chainage 588/25-27 Xhivsagar- Khurmabad including Viaduct Spans, Approch road, Service roads as per IRC standard in Mughalsarai -Sone Nagar Section of East Central Railway. JHAJHARIA-SHRESHTABHISHEK JV. JHAJHARIA NIRMAN LIMITED HAVING SHARE OF 51% |
DY. CHIEF, PROJECT MANAGER/ENGG, SWARNA COMPLEX, 2ND FLOOR, SUSUWAHI, VARANASI |
10 |
SECL/BSP/SDG/2016/1718 |
Earthwork in Railway formation, Construction of bridges, blanketing, P. Way
Linking Works including supply of P. Way fittings & track Ballast, PSC Sleepers
and Points & crossings in connection with construction of railway infrastructure
for providing railway siding at Kusmunda project for dispatch of washed and
raw coal (PACKAGE-II) |
South Easter Coalfields
Limited office of the
General Manager
(Siding), seepat Road
Bilaspur (C.G.) 495006 |
11 |
269/EW/BR/CWA-KM55/15-16/24/JNL/ |
Execution of balance civil engineering works in mega block to make section fit
for commissioning including dismantling of existing NG track, execution of
earthwork in formation, construction of minor/major bridges by launching of
precast segments/cast in situ, all passenger amenity works, and other
miscellaneous allied works from Ch 0.00 (including Chhindwara yard) to Ch
55000 in connection with Chhindwara β Nagpur Gauge conversion project. |
SOUTH EAST CENTRAL
RAILWAY, NAGPUR |
12 |
299/EW/Br/NIR-PNJ 15-16/62/JNL |
Execution of balance civil engineering work in mega block to make section fit for
commissioning including execution of earthwork in formation, construction of
minor bridges by launching of precast segments/cast in situ, and related
protection work and other allied miscellaneous work between Nainpur (including
Nainpur yard) to Padriganj station including Padriganj Station yard) in
connection with Gondia- Jabalpur Gauge Conversion Project. |
SOUTH EAST CENTRAL
RAILWAY, NAGPUR |
13 |
222/ROB/Min. Br./CWA-NGP/13-13/99/JNPL |
Construction of ROBs (with PSC superstructure) at Ch: 35400 & Ch: 41760,
construction of aqueduct (with PSC superstructure ) at Ch: 51950 & Ch: 52090
construction of minor bridges (cast in situ and launching of precast RCC Box)
and retaining walls in between Ch: 41100 to Ch: 43600 and Ch: 46000 to Ch:
56000 including aillied and miscellaneous works in connection with ChhindwaraNagpur Gauge conversion project. |
SOUTH EAST CENTRAL
RAILWAY, NAGPUR |
14 |
303/EW/Br/SEONY-BHV/15-16/139/JNL |
Execution of balance civil engineering work in mega block to make section fit for
commissioning including dismantling of NG track,execution of earthwork in
formation, construction of minor bridges, LHS/ROB by launching of precast box
segments/ cast in situ, allied protection work, and other miscellaneous works in
section between Seoni to Bhoma (Excluding both yard) in connection with
Chhindwara-Nainpur- Mandla Fort Gauge conversion project |
SEC RAILWAY |
15 |
350/CONST OF ROB AT LC NO-AB-18-BJRI YARD/SECR/18 |
Construction of Road Over Bridge for closure of manned LC No: AB-18 at KM
916/22-24 in Bijuri Yard of Railway span 1x30.5 M + 2x18.3 M (Composite
Girders) and on approaches 9 x 20M RCC span with RE Wall on AnuppurAmbikapur section of Bilaspur Division. |
SEC RAILWAY |
16 |
249/Mega Block/Nainpur-Ghansore/CEC/SECR/16 |
Execution of all balance civil works to make section fit for commissioning except
ballast supply, track linking and building works in between Nainpur (excluding) β
Ghansore (excluding) section (approximately 32 kms) in connection with GondiaJabalpur gauge conversion project. |
SEC RAILWAY |
17 |
DGM I/c (PCC-NTK)/5(3051)/15/1230 |
Balance Railway track work for Plant Internal Yard (Package-95-B1) |
SAIL BHILAI |
18 |
216/LHS/SA ONGAKPKD/12- 13/68/MS/2
09 |
Construction of limited height subway with precast RCC Boxes including only
casting or casting and launching of precast RCC box & base slab, segments at
diffrent unmanned level crossing gates between chainage 97400m (saonga PH)
connection with gauge conversion work of chindwara- Nagpur section of SEC
Railway in maharashtra state. |
SECR |
19 |
215/EW/CH-41000-43600 & CH 46000-56000/12-13/98/JNPL |
Execution of earthwork & related protection work (including small toe walls,
Stone pitching drain works etc.) between Ch: 41100 to Ch: 43600 & Ch: 46000
to Ch: 56000 including in the approaches of viaduct Br. No. 84 & Br. 89 and
allied and miscellaneous works in connection with Chhindwara β Nagpur gauge
conversion project.
|
S.E.C. Railway Gondia |
20 |
24 /DENBSP /13-14 |
Construction of light Road Over Bridge (light ROB) in connection with Closing of
Level Crossing No.AB-6 between mauhari- Harad, Level Crossing No. BC-1
between karonji- Bishrampur, Re-building of ROB- 95 on NH-78 at Km. 995/10-
11 between Darritola-Nagar and improvement of road and its approaches of
ROB-95, 107, 195 & 205 under jurisdiction of Assistance Divisional Engineer/
Manendragarh. |
SECR |
21 |
185/LHS/LC-37O/Dadha para-Belha/CEC/SECR/2014 |
Construction of Limited Height Subway (LHS) at LC.No.370 between DadhaparaBelha on Howrah Mumbai route on Bilaspur Balodabazar Road. |
SECR |
22 |
193/RUB/AB-10/AB-11/KOTMA/CEC/SECR/14 |
Construction of Road Under Bridge for closing of manned LC No: AB-10 in
KOtma Yard and Construction of Road Over Bridge for closing of manned LC no:
AB-11 between Kotma -Baihatoala stations on Anuppur-AMbikapur setion of
Bilaspur Division
|
Dy. Chief Engineer/SEC
RAILWAY, Shahdol |
23 |
IRCON/2059/CGRP/E-TENDER/Phase-I/Ballast/2891 |
Supply and stacking of machine crushed stone ballast of 50 mm size (65mm to
20mm well graded) for railway stack as per relevant RDSO specifications
between Km 0.00 Kharsia to Km 45.00 Korichhapar in connection with
construction of New BG Elrctrified Double Rail line from Kharsia to
Dharamjaygarh in the state of chhattisgarh |
IRCON |
24 |
102/DEN-BSP/13-14 |
Supply delivery and stacking of 1,00,000 cum. Machine crushed track ballast as
per Rly's specification at Nowrozabad Depot from outside Railway land and
loading into railway wagons under the jurisdiction of ADEN/ Umaria of Bilaspur
division
|
SECR Bilaspur |
25 |
162/Ballast/CPH-BUA/CEC/SECR/14
|
Supply and stacking of 47778 cum machine crushed stone ballast on cess in
section between CHP-BUA in connection with construction of 3rd line bet CHPJSG conforming to sprcification of machine crushed stone ballast issued by
RDSO corrected upto date
|
SECR Bilaspur |
26 |
06/DEN-BSP/12-13 |
Supply, delivery and stacking of 1,00,000 cum machine crushed track ballast as
per railways specifiction at Nowrozabad Depot from out side railway land and
loading into railway wagons under the jurisdiction of ADEN/UMR of BSP Division |
SECR Bilaspur |
27 |
23/DEN-BSP/2012-13 |
Provision of additional PF shelter to cover Platform at PF 2/3 at CPH, KHS & RIG
provision of additional PF shelter to cover balance surface at KRBA, provision of
IRS type platform shelter on PF no.1 connecting gap between GRP office &
refreshment room at RIG, replacement of damaged AC sheet by zinc alloy sheet
on IRS type platform shelter & improvement of cycle stand at RIG and provision
of shed of FOB at BUA, SKT & KHS under the jurisdiction of Sr. DEN/East/
Bilaspur
|
SEC Railway |
28 |
224/Balance Work/Br 414/Kachhpura-Gwarighat/CEC/SECR/12 |
Execution of balance works for construction of Br No 414 (2X6.0m RCC Box)
including earth work and other miscellaneous works in itβs approaches and
construction of retaining wall near Br No 414 in Kachhpura-Gwarighat section on
detour alignment in connection with Gondia-Jabalpur Gauge conversion project. |
SEC Railway |
29 |
235/Pindrai-Ghansore/CEC/SECR/12 |
Balance and finishing work for Execution of earthwork in formation and
construction of minor bridges between Ch.8000 to Ch.11640 in Pindrai -
Ghansore section on detoured alignment in connection with Gondia - Jabalpur
gauge conversion project. |
SEC Railway |
30 |
28/2013-14 Division No. 1 Bilaspur |
Construction of Primary Health Building at Kargikala Vikaskhand, Kota Distt.
Bilaspur |
PWD |
31 |
6/2013-14 Division Pendra |
Construction of Primary Health Building at Navagaon Salka Block Kota |
PWD |
32 |
52/2013-14 Division Pendra |
Construction of Higher Secondary School Building at Salkanavagaon Vikaskhand
Kota Distt. Bilaspur |
PWD |
33 |
123/2013-14 Division Pendra |
Construction of Farmer Service Center at Kota |
PWD |
34 |
174/CEC/P.P YARD/SECR/2010
|
Execution of earthwork, extension of bridges, roads, service buildings etc. and
other allied and misc. works in connection with addl. Freight maintenance depot
at CEY (PP Yard) with provision of 3 (three) examination lines and one
shunting neck of full length. |
SEC Railway |
35 |
167/EW/NIR-MFR/11-12/09/JNPL dtd 23.12.2011 |
Execution of earthwork in formation upto NG formation level along the NG
alignment and upto proposed BG formation level in detour alignment, without
stopping NG train service between Mandlafort and Nainpur stations (CH: 00
(CSB NIR) to 43000 (MFR) in connection with Mandlafort-Nainpur-Chhindwara
gauge conversion project |
SEC Railway |
36 |
93/DEN-BSP/12-13 Dtd 17.01.2013
|
Construction of limited height subway by cut and cover method in connection
with closing of level crossing Nos AB-54, & 55 at Km 987/8-9 & Km 987/13-14
between KTO-SJQ, AB-35 at Km 963/2-3 between NGE-BRH and AB-48 at Km
963/2-3 between NGE-BRH and AB-48 at KM 978-11-12 between BRH-KTO
under the jurisdiction of Bilaspur division
|
SEC Railway |
37 |
196/QRS/WRS/R/CEC/SECR/2014 |
Construction of 20 units of type II, 30 units of type III and 6 units of type IV
quarters along with water supply, sewer line, road works and misc works
including electrical work in WRS colony Raipur for Staff of Diesel Loco Shed
Raipur. |
SEC Railway |
38 |
87/DEN-BSP/12-13 |
Construction of limited height subway by cut & cover method in connection with
closing of level crossing at km871/14-16 between APR-MZH at km 995/3-4
between katora-surajpur and km 1008/03-04 between Surajpur-Karanji under
the jurisdiction of Assistant Divisional Engineer/Manendragarh
|
SEC Railway |
39 |
92/DEN-BSP/12-13 Dt. 17.01.2013
|
Construction of limited height subway by cut & cover method in connection with
closing of level crossing at km 976/14-16 between Baikundpur-Katora, at km
963/1-3 in tiger hill and at Km 865.57 between Chullah-Mohari under the
jurisdiction of Asst. Divisional Engineer/Manendragarh
|
SEC Railway |
40 |
227/ROB/BUH-AAL/CEC/SECR/15 |
Construction of Road Over Bridge (Concrete Steel composite girder bridge
1x30.0 m) (composite girder) in lieu of existing old ROB (BK-103) at km 889/31-
890/1 between Amlai-Burhar stations on Bilaspur-Katni section of Bilaspur
division. |
SECR |
41 |
DGM I/c (PCC-NTK)/5(2874)/11/404A Dtd 29.06.2011
|
Construction of Railway siding and MGR system including earthwork,
construction of bridges, supply of ballast and P-way linking in connection with
modernization of Peripheral Yard of Bhilai Steel Plant at Bhilai (C.G.) (Pkg 095-
A) (Schedule-A) |
SAIL BHILAI |
42 |
17/EE/RCD/2016-17 |
C/O 1 No. 480 mens barrack including water supply, sanitary installation internal
and external electric installation fire fighting alarm system lift and drainage for
GC, CRPF at Arang Raipur |
CPWD |
43 |
09/EE/RCD |
Comprehensive Development & Bulk Service. SH: (Road work, water supply,
Sewerage system and Drainage for Plot-A and Providing HT & LT Sub-station,
Street Lighitng, DG set and Pump set for (plot- A& B) at CG, CRPF, Arang Raipur) |
CPWD |
44 |
04/EE/BCD/2016-17 |
C/o A Tlpe School Building, 4 No. Type-II, 4 No.
TYPE-III, 1 No. Type-V, Staff Quarter, Boundary
wall, Development Worh Water Supply & Sanitary,
etc at Kerdriva Vidyalaya Koba (C.G-) |
CPWD |
45 |
IRCON/2059/CGRP/eTender/TL-PKG-III/18-19/BSP-15/103 |
Assembling, Laying and linking of Railway track for main line & loop line with
Contractor's own P-Way Materails (excpt rails, sleepers & ballast) including
spreading of ballast and all other allied works required for commissioning of UP
line of double railway line between Km 45.0(korihapar) to Km 75.055
(Dharamjaygarh) in connection with New BG Lecstrified Double Rail line from
Kharsia to Dharamjaygarh in the state of Chhatisgarh |
IRCON INTERNATIONAL
LTD, 1st Floor, North
Avenue, Takhatpur Road
Uslapur, Bilaspur -495001 |
46 |
04/DEN-BSP/2020-21 |
Supply, delivery and stacking of 1,25,000 Cum 50mm guage machine
crushed track ballast as per Railway's specification at Pendra Depot
from outside Railway land and loading into Railway into Railway
wagons under the jurisdiction of ADEN/Pendra of Bilaspur Division |
S.E.C. Railway,
Bilaspur |
47 |
SECR/BSP/Civil/2020/0001 |
Supply, delivery and stacking of 1,25,000 Cum. 50 mm guage machine
crushed track ballast as pr Rly's specification at Nowrozabad Depot
from outside Railway land and loading into railway wagons under the
jurisdiction of ADEN / UMR of Bilaspur Division
|
S.E.C. Railway Bilaspur |
48 |
301/EW/Br./PUE-KLZ/15-16/89/JNL |
Execution of balance civil engineering works in mega block to make
section fit for commissioning including dismantling of existing NG track,
execution of earthwork in formation, construction of minor bridges,
LHS/ROB bby launching of precast segments/cast in situ, allied
protection work and other miscellaneous works in section between
Palari (Including Palari Yard) to Keolari (excluding Keolari yards) in
connection with CWA-NIR-MFR GAUGE CONVERSION PROJECT |
Dy. Chief Engineer
(Con.) S.E.C. Raiway,
Nainpur) |
49 |
IRCON/3018/DFCCIL-CTP-12/Bridge Work/SS2-B2/08-
353/6764 |
Construction of bridges (Major, Minor and RUB) form DFC Ch: 151.00
to DFC Ch: 162.00 in connection with construction of Western
Dedicated Freight Corrdor phase-II Vaitarna-Sachin Section: Package
(SS282- Bridge Works)" |
General Manager/PH
IRCON
INTERNATIONAL
LIMITED |
50 |
NHSRCL(ADI)/MA/02/Tender/Misc.work/391.2/6474 |
Miscellaneous works of rBuilding constuction and Utlity shifting in
NHSRCL C-7 & C-8 package section in Ahmedabad in connection with
Mumbai-Ahmedabad High Speed Rail projectg |
Dy. General Manager
(Civil) National High
Speed Rail
Corporation Ltd.
Ahmedabad |