Completed Projects

LANDMARK PROJECTS COMPLETED

SN Agmt No. Description of Work Contract Awarding Authority
1 BRC/EN/TENDER-ROB/LC-142, 153 & 163/218/VOL III Construction of 2-Lane Road Over Bridge including approaches in lieu of existing Level Crossing Nos. II 142 At Rly Km-255/27-29 (DFCC Ch- 4/118.408) between Sachin and Bhestan stations of Western Railway, III 153 At Rly km 281/28-30 (DFCC Ch: 32413.160) between Sayan and Kudsad stations of Western Railway, III 163 At Rly km 301/30-32 (DFCC Ch: 52553.872) between Kosamba and Hathuran stations of Western Railway. CHIEF GENERAL MANAGER, DFCCIL, 4TH FLOOR, BLOCK A, NARMADA NAHER, BHAVAN, SARDAR SAROVER, NARMADA NIGAM LTD, CHHANI JAKHAT NAKA, VADODARA
2 368/APR-SNGH/3RD LINE APR-KTE/CEC/SECR/18 Execution of earth work in formation, construction of major and minor bridges, supply of machine crushed stone ballast, transportation of P.Way materials, execution of P.Way works, welding and other allied miscellaneous works between Anuppur to Singpur (Ex) in connection with construction of Anuppur-Katni 3rd line of Bilaspur Division of South East Central Railway. DY. CHIF ENGINEER / CON-I SECR SHADOL MP
3 RITES/RPO-N/BSP/AP-PR/PACKAGE-1/TS/2016 Construction of Earth work in formation, Bridges & Structures, P-way, shifting/provision of Electric/S&T utilities and other allied works for Third Line from Pendra Road to Anuppur section(50.10Km) of Bilaspur Division of South East Central Railway. GM/RPO/NORTH, ROC-1, GURGAON RITES LIMITED
4 332/TROKOKA/3RDLINE/17-18/JNL DTD. 01.03.2018. Execution of work for design of bridges and buildings, earthwork in formation, construction of major and minor bridges, service buildings, (S&T Building, gate goomty, end goomty, OHE Depot, PSI depot, etc), Supply of machine crushed stone ballast, transportation of railway materials, P.Way works general electrical works for buildings & stations and other allied works between KOKA station (Including yard) to TIRODA station (Including yard) in connection with 3rd BG Railway line between Rajanandgaon - Kalumna stations of Nagpur Division of SEC Railway. CHIEF ENGINEER (CON) SEC RAILWAY NAGPUR
5 331/KOKA-RRL/3RDLINE/17-18/JNL DTD. 28.02.2018. Execution of work for design of bridges and buildings, earthwork in formation, constructrion of major and minor bridges,service buildings, (S&T Building, gate goomty, end goomty, OHE Depot, PSI depot, etc), Supply of machine crushed stone ballast, transportation of railway materials, P.Way works general electrical works for buildings & stations and other allied works between Revral station (including yard) to Koka station (Excluding yard) CHIEF ENGINEER (CON) SEC RAILWAY NAGPUR
6 MGS/EN/10/2018-19/LC/52-II & 55/Bihar/274. Construction of Two-Lane Road Over Bridge (ROB) in lieu of 02 (two) level crossings No. 52-II at IR Chainage 600/5-7 between Kudra-Pusauli and No. 55 at IR Chainage 605/25-27 between Kudra-Pusauli including Obligatory Spans, Viaduct Spans, approaches roads, etc. complete in all respect in Mughalsarai division of East Central Railway. DY. CHIEF, PROJECT MANAGER/ENGG, SWARNA COMPLEX, 2ND FLOOR, SUSUWAHI, VARANASI
7 MGS/EN/18/2018-19/LC-52-54-57/Bihar/282. Construction of Two-Lane Road Over Bridge (ROB) in lieu of 03 (three) level crossings No. 52/C/E at IR Chainage 594/17-19 Between Shivsagr - Khurmabad, No. 54/C/E at IR chainage 603/17-19 between Kudra -Pusauli and No. 57/C/E at IR chainage 612/25-27 between Pisauli - Mithani including Obligatory Span, Composite Grider Span,Viaduct Spans, Approach Roads and Service Roads etc. complete in all respect in Mughalsarai division of East Central Railway. DY. CHIEF, PROJECT MANAGER/ENGG, SWARNA COMPLEX, 2ND FLOOR, SUSUWAHI, VARANASI
8 MGS/EN/16/2018-19/LC-35-37-48/Bihar/280. Construction of Two-Lane Road Over Bridge (ROB) in lieu of 03 (three) level crossings No. 35/C/E at IR Chainage 556/25-27 between Dehri-on-Sone-Pahleza, No. 37/C/E at IR Chainage 562/11-13 between Pahleza- Karwandia and No. 48/C/T at IR Chainage 585/1-3 between Kumhau -Shivsagar including Obligatory Span, Composite Grider Span, Viaduct Spans, Approach Roads and Service Roads etc. Complete in all respect in Mughalsarai division of East Central Railway. Dy. CPM/ Engg- II DFCCIL/DDU
9 MGS/EN/09/2018-19/LC/41-46-49-50/Bihar/273 Dtd. 29.09.2018 Construction of Approch Portion (except Railway Portion obligatory spans) of Two -Lane Road Over Bridge (ROB) at 04 (four) level crossing No. 41/C/E at IR Chainage 569/19-17 between Karwandia-Sasaram, No. 46/C/T IR Chainage 581/1-3Kumhau-Shivsagar, No. 49C/T IR Chainage 586/21-23 Shivsagar-Khurmabad and No. 50C/E IR Chainage 588/25-27 Xhivsagar- Khurmabad including Viaduct Spans, Approch road, Service roads as per IRC standard in Mughalsarai -Sone Nagar Section of East Central Railway. JHAJHARIA-SHRESHTABHISHEK JV. JHAJHARIA NIRMAN LIMITED HAVING SHARE OF 51% DY. CHIEF, PROJECT MANAGER/ENGG, SWARNA COMPLEX, 2ND FLOOR, SUSUWAHI, VARANASI
10 SECL/BSP/SDG/2016/1718 Earthwork in Railway formation, Construction of bridges, blanketing, P. Way Linking Works including supply of P. Way fittings & track Ballast, PSC Sleepers and Points & crossings in connection with construction of railway infrastructure for providing railway siding at Kusmunda project for dispatch of washed and raw coal (PACKAGE-II) South Easter Coalfields Limited office of the General Manager (Siding), seepat Road Bilaspur (C.G.) 495006
11 269/EW/BR/CWA-KM55/15-16/24/JNL/ Execution of balance civil engineering works in mega block to make section fit for commissioning including dismantling of existing NG track, execution of earthwork in formation, construction of minor/major bridges by launching of precast segments/cast in situ, all passenger amenity works, and other miscellaneous allied works from Ch 0.00 (including Chhindwara yard) to Ch 55000 in connection with Chhindwara – Nagpur Gauge conversion project. SOUTH EAST CENTRAL RAILWAY, NAGPUR
12 299/EW/Br/NIR-PNJ 15-16/62/JNL Execution of balance civil engineering work in mega block to make section fit for commissioning including execution of earthwork in formation, construction of minor bridges by launching of precast segments/cast in situ, and related protection work and other allied miscellaneous work between Nainpur (including Nainpur yard) to Padriganj station including Padriganj Station yard) in connection with Gondia- Jabalpur Gauge Conversion Project. SOUTH EAST CENTRAL RAILWAY, NAGPUR
13 222/ROB/Min. Br./CWA-NGP/13-13/99/JNPL Construction of ROBs (with PSC superstructure) at Ch: 35400 & Ch: 41760, construction of aqueduct (with PSC superstructure ) at Ch: 51950 & Ch: 52090 construction of minor bridges (cast in situ and launching of precast RCC Box) and retaining walls in between Ch: 41100 to Ch: 43600 and Ch: 46000 to Ch: 56000 including aillied and miscellaneous works in connection with ChhindwaraNagpur Gauge conversion project. SOUTH EAST CENTRAL RAILWAY, NAGPUR
14 303/EW/Br/SEONY-BHV/15-16/139/JNL Execution of balance civil engineering work in mega block to make section fit for commissioning including dismantling of NG track,execution of earthwork in formation, construction of minor bridges, LHS/ROB by launching of precast box segments/ cast in situ, allied protection work, and other miscellaneous works in section between Seoni to Bhoma (Excluding both yard) in connection with Chhindwara-Nainpur- Mandla Fort Gauge conversion project SEC RAILWAY
15 350/CONST OF ROB AT LC NO-AB-18-BJRI YARD/SECR/18 Construction of Road Over Bridge for closure of manned LC No: AB-18 at KM 916/22-24 in Bijuri Yard of Railway span 1x30.5 M + 2x18.3 M (Composite Girders) and on approaches 9 x 20M RCC span with RE Wall on AnuppurAmbikapur section of Bilaspur Division. SEC RAILWAY
16 249/Mega Block/Nainpur-Ghansore/CEC/SECR/16 Execution of all balance civil works to make section fit for commissioning except ballast supply, track linking and building works in between Nainpur (excluding) – Ghansore (excluding) section (approximately 32 kms) in connection with GondiaJabalpur gauge conversion project. SEC RAILWAY
17 DGM I/c (PCC-NTK)/5(3051)/15/1230 Balance Railway track work for Plant Internal Yard (Package-95-B1) SAIL BHILAI
18 216/LHS/SA ONGAKPKD/12- 13/68/MS/2 09 Construction of limited height subway with precast RCC Boxes including only casting or casting and launching of precast RCC box & base slab, segments at diffrent unmanned level crossing gates between chainage 97400m (saonga PH) connection with gauge conversion work of chindwara- Nagpur section of SEC Railway in maharashtra state. SECR
19 215/EW/CH-41000-43600 & CH 46000-56000/12-13/98/JNPL Execution of earthwork & related protection work (including small toe walls, Stone pitching drain works etc.) between Ch: 41100 to Ch: 43600 & Ch: 46000 to Ch: 56000 including in the approaches of viaduct Br. No. 84 & Br. 89 and allied and miscellaneous works in connection with Chhindwara – Nagpur gauge conversion project. S.E.C. Railway Gondia
20 24 /DENBSP /13-14 Construction of light Road Over Bridge (light ROB) in connection with Closing of Level Crossing No.AB-6 between mauhari- Harad, Level Crossing No. BC-1 between karonji- Bishrampur, Re-building of ROB- 95 on NH-78 at Km. 995/10- 11 between Darritola-Nagar and improvement of road and its approaches of ROB-95, 107, 195 & 205 under jurisdiction of Assistance Divisional Engineer/ Manendragarh. SECR
21 185/LHS/LC-37O/Dadha para-Belha/CEC/SECR/2014 Construction of Limited Height Subway (LHS) at LC.No.370 between DadhaparaBelha on Howrah Mumbai route on Bilaspur Balodabazar Road. SECR
22 193/RUB/AB-10/AB-11/KOTMA/CEC/SECR/14 Construction of Road Under Bridge for closing of manned LC No: AB-10 in KOtma Yard and Construction of Road Over Bridge for closing of manned LC no: AB-11 between Kotma -Baihatoala stations on Anuppur-AMbikapur setion of Bilaspur Division Dy. Chief Engineer/SEC RAILWAY, Shahdol
23 IRCON/2059/CGRP/E-TENDER/Phase-I/Ballast/2891 Supply and stacking of machine crushed stone ballast of 50 mm size (65mm to 20mm well graded) for railway stack as per relevant RDSO specifications between Km 0.00 Kharsia to Km 45.00 Korichhapar in connection with construction of New BG Elrctrified Double Rail line from Kharsia to Dharamjaygarh in the state of chhattisgarh IRCON
24 102/DEN-BSP/13-14 Supply delivery and stacking of 1,00,000 cum. Machine crushed track ballast as per Rly's specification at Nowrozabad Depot from outside Railway land and loading into railway wagons under the jurisdiction of ADEN/ Umaria of Bilaspur division SECR Bilaspur
25 162/Ballast/CPH-BUA/CEC/SECR/14 Supply and stacking of 47778 cum machine crushed stone ballast on cess in section between CHP-BUA in connection with construction of 3rd line bet CHPJSG conforming to sprcification of machine crushed stone ballast issued by RDSO corrected upto date SECR Bilaspur
26 06/DEN-BSP/12-13 Supply, delivery and stacking of 1,00,000 cum machine crushed track ballast as per railways specifiction at Nowrozabad Depot from out side railway land and loading into railway wagons under the jurisdiction of ADEN/UMR of BSP Division SECR Bilaspur
27 23/DEN-BSP/2012-13 Provision of additional PF shelter to cover Platform at PF 2/3 at CPH, KHS & RIG provision of additional PF shelter to cover balance surface at KRBA, provision of IRS type platform shelter on PF no.1 connecting gap between GRP office & refreshment room at RIG, replacement of damaged AC sheet by zinc alloy sheet on IRS type platform shelter & improvement of cycle stand at RIG and provision of shed of FOB at BUA, SKT & KHS under the jurisdiction of Sr. DEN/East/ Bilaspur SEC Railway
28 224/Balance Work/Br 414/Kachhpura-Gwarighat/CEC/SECR/12 Execution of balance works for construction of Br No 414 (2X6.0m RCC Box) including earth work and other miscellaneous works in it’s approaches and construction of retaining wall near Br No 414 in Kachhpura-Gwarighat section on detour alignment in connection with Gondia-Jabalpur Gauge conversion project. SEC Railway
29 235/Pindrai-Ghansore/CEC/SECR/12 Balance and finishing work for Execution of earthwork in formation and construction of minor bridges between Ch.8000 to Ch.11640 in Pindrai - Ghansore section on detoured alignment in connection with Gondia - Jabalpur gauge conversion project. SEC Railway
30 28/2013-14 Division No. 1 Bilaspur Construction of Primary Health Building at Kargikala Vikaskhand, Kota Distt. Bilaspur PWD
31 6/2013-14 Division Pendra Construction of Primary Health Building at Navagaon Salka Block Kota PWD
32 52/2013-14 Division Pendra Construction of Higher Secondary School Building at Salkanavagaon Vikaskhand Kota Distt. Bilaspur PWD
33 123/2013-14 Division Pendra Construction of Farmer Service Center at Kota PWD
34 174/CEC/P.P YARD/SECR/2010 Execution of earthwork, extension of bridges, roads, service buildings etc. and other allied and misc. works in connection with addl. Freight maintenance depot at CEY (PP Yard) with provision of 3 (three) examination lines and one shunting neck of full length. SEC Railway
35 167/EW/NIR-MFR/11-12/09/JNPL dtd 23.12.2011 Execution of earthwork in formation upto NG formation level along the NG alignment and upto proposed BG formation level in detour alignment, without stopping NG train service between Mandlafort and Nainpur stations (CH: 00 (CSB NIR) to 43000 (MFR) in connection with Mandlafort-Nainpur-Chhindwara gauge conversion project SEC Railway
36 93/DEN-BSP/12-13 Dtd 17.01.2013 Construction of limited height subway by cut and cover method in connection with closing of level crossing Nos AB-54, & 55 at Km 987/8-9 & Km 987/13-14 between KTO-SJQ, AB-35 at Km 963/2-3 between NGE-BRH and AB-48 at Km 963/2-3 between NGE-BRH and AB-48 at KM 978-11-12 between BRH-KTO under the jurisdiction of Bilaspur division SEC Railway
37 196/QRS/WRS/R/CEC/SECR/2014 Construction of 20 units of type II, 30 units of type III and 6 units of type IV quarters along with water supply, sewer line, road works and misc works including electrical work in WRS colony Raipur for Staff of Diesel Loco Shed Raipur. SEC Railway
38 87/DEN-BSP/12-13 Construction of limited height subway by cut & cover method in connection with closing of level crossing at km871/14-16 between APR-MZH at km 995/3-4 between katora-surajpur and km 1008/03-04 between Surajpur-Karanji under the jurisdiction of Assistant Divisional Engineer/Manendragarh SEC Railway
39 92/DEN-BSP/12-13 Dt. 17.01.2013 Construction of limited height subway by cut & cover method in connection with closing of level crossing at km 976/14-16 between Baikundpur-Katora, at km 963/1-3 in tiger hill and at Km 865.57 between Chullah-Mohari under the jurisdiction of Asst. Divisional Engineer/Manendragarh SEC Railway
40 227/ROB/BUH-AAL/CEC/SECR/15 Construction of Road Over Bridge (Concrete Steel composite girder bridge 1x30.0 m) (composite girder) in lieu of existing old ROB (BK-103) at km 889/31- 890/1 between Amlai-Burhar stations on Bilaspur-Katni section of Bilaspur division. SECR
41 DGM I/c (PCC-NTK)/5(2874)/11/404A Dtd 29.06.2011 Construction of Railway siding and MGR system including earthwork, construction of bridges, supply of ballast and P-way linking in connection with modernization of Peripheral Yard of Bhilai Steel Plant at Bhilai (C.G.) (Pkg 095- A) (Schedule-A) SAIL BHILAI
42 17/EE/RCD/2016-17 C/O 1 No. 480 mens barrack including water supply, sanitary installation internal and external electric installation fire fighting alarm system lift and drainage for GC, CRPF at Arang Raipur CPWD
43 09/EE/RCD Comprehensive Development & Bulk Service. SH: (Road work, water supply, Sewerage system and Drainage for Plot-A and Providing HT & LT Sub-station, Street Lighitng, DG set and Pump set for (plot- A& B) at CG, CRPF, Arang Raipur) CPWD
44 04/EE/BCD/2016-17 C/o A Tlpe School Building, 4 No. Type-II, 4 No. TYPE-III, 1 No. Type-V, Staff Quarter, Boundary wall, Development Worh Water Supply & Sanitary, etc at Kerdriva Vidyalaya Koba (C.G-) CPWD
45 IRCON/2059/CGRP/eTender/TL-PKG-III/18-19/BSP-15/103 Assembling, Laying and linking of Railway track for main line & loop line with Contractor's own P-Way Materails (excpt rails, sleepers & ballast) including spreading of ballast and all other allied works required for commissioning of UP line of double railway line between Km 45.0(korihapar) to Km 75.055 (Dharamjaygarh) in connection with New BG Lecstrified Double Rail line from Kharsia to Dharamjaygarh in the state of Chhatisgarh IRCON INTERNATIONAL LTD, 1st Floor, North Avenue, Takhatpur Road Uslapur, Bilaspur -495001
46 04/DEN-BSP/2020-21 Supply, delivery and stacking of 1,25,000 Cum 50mm guage machine crushed track ballast as per Railway's specification at Pendra Depot from outside Railway land and loading into Railway into Railway wagons under the jurisdiction of ADEN/Pendra of Bilaspur Division S.E.C. Railway, Bilaspur
47 SECR/BSP/Civil/2020/0001 Supply, delivery and stacking of 1,25,000 Cum. 50 mm guage machine crushed track ballast as pr Rly's specification at Nowrozabad Depot from outside Railway land and loading into railway wagons under the jurisdiction of ADEN / UMR of Bilaspur Division S.E.C. Railway Bilaspur
48 301/EW/Br./PUE-KLZ/15-16/89/JNL Execution of balance civil engineering works in mega block to make section fit for commissioning including dismantling of existing NG track, execution of earthwork in formation, construction of minor bridges, LHS/ROB bby launching of precast segments/cast in situ, allied protection work and other miscellaneous works in section between Palari (Including Palari Yard) to Keolari (excluding Keolari yards) in connection with CWA-NIR-MFR GAUGE CONVERSION PROJECT Dy. Chief Engineer (Con.) S.E.C. Raiway, Nainpur)
49 IRCON/3018/DFCCIL-CTP-12/Bridge Work/SS2-B2/08- 353/6764 Construction of bridges (Major, Minor and RUB) form DFC Ch: 151.00 to DFC Ch: 162.00 in connection with construction of Western Dedicated Freight Corrdor phase-II Vaitarna-Sachin Section: Package (SS282- Bridge Works)" General Manager/PH IRCON INTERNATIONAL LIMITED
50 NHSRCL(ADI)/MA/02/Tender/Misc.work/391.2/6474 Miscellaneous works of rBuilding constuction and Utlity shifting in NHSRCL C-7 & C-8 package section in Ahmedabad in connection with Mumbai-Ahmedabad High Speed Rail projectg Dy. General Manager (Civil) National High Speed Rail Corporation Ltd. Ahmedabad