How we deliver
Power plants, steel plants and mines depend on reliable rail connectivity. We deliver sidings end to end — formation, bridges, track and ancillary buildings — and phase yard remodelling into traffic and power blocks so that trains keep running while lines are added, connected and commissioned.
What we do
- Private and industrial sidings, including merry-go-round (MGR) systems
- Rail infrastructure for wagon tipplers and ash-disposal yards
- Yard remodelling and yard modification on running lines
- Loop lines, banking-engine sidings and freight maintenance depots
- Piling and foundations for power-plant structures

Selected projects
- NTPC Sipat, rail infrastructure for coal-rake handling at the wagon tippler — RITES
- NTPC Sipat, yard lines for dry-ash disposal by rail (Pkg II) — RITES
- Khurja Super Thermal Power Project, rail link — THDC India
- Bilaspur yard remodelling — South East Central Railway (SECR)
- Rajkot–Kanalus doubling, six yard-modification packages covering 12 yards (JV) — Western Railway
- Shahdol and Anuppur yard remodelling — SECR
- Khongsara, long-haul loop and banking-engine siding — SECR
- NLC Talabira 3 × 800 MW thermal power project, piling and foundations — BHEL
- Kusmunda coal siding, Package II (completed) — SECL
- Bhilai Steel Plant peripheral yard, railway siding and MGR system (completed) — SAIL
- PP Yard freight maintenance depot (completed) — SECR

